Section B - Annual Zonal Conference 2012 of North Zone

Station
S.No.
Agenda Points
Date & Time of submitting information
 
DDK - CPC DELHI
1
14/05/2012 17:16:02
 
2
Requiment 4 channel Automation system for playback of DD channel at CPC: CPC is currently running channelplayback services for 03 DD channel including two chennel automation system.The system is very old and obsolete.Service support including the supply of spare parts, the hardware and the software system from the vender is not available. It is proposed that provision of 04 channel Automation system may be made for CPC in a fresh scheme/Plan
14/05/2012 17:33:01
 
3
Replacment /Repairs of 8 Nos. Ikagami HK 388 Cameras in Studio A& B of CPC are required,Presently 02nos. cameras are defective.The matter is already reffered to O/O ADG(NZ) & DG:DD.
17/05/2012 17:53:54
 
4
Requirment of 01 no. of 64x64 SDI(Emdedded audio) Router for CPC MSR(Feed Room) for various OB activity & better connectivity with studio,playback booth,earth station etc. is urgently required.
17/05/2012 18:00:05
 
5
Requirment DVC Pro 50 VTRs :10 nos of VTRs are urgently required for technical area viz., Feed room,Edit suits,Studio A & B.
17/05/2012 18:05:57
 
6
Requirment of 15 nos.SDI monitor for various technical area Viz studio A & B ,DD sports, & Feed room.
17/05/2012 18:09:35
 
7
15 nos.condenser Lepal microphone are urgently required in various technical area viz ENG,Studio A &B.The requirment has already been sent to O/O ADG(NZ).
17/05/2012 18:14:42
 
8
02 nos Frame synchroniser are urgently required in studio B for live OB coverages.Important sports event are schedule from CPC,same may please be provided on priority.
17/05/2012 18:25:24
 
9
OFC link status:At present we have 2 send & 4 receive channel from DDK Delhi. As CPC transporting 3 channel DD Sports,DD India, on OFC link & DD Urdu on MW link.Minimum 02 transe OFC link may be provided for DD Urdu & Feed line in any emergency situation for smooth transmission.
17/05/2012 18:37:54
 
10
Operational staff shortage: Shortage of staff has developed ,due to lot of recent transfers and subsitute not provided in these order.Present position of staff 1)SEA-13 2) EA-22 Additional staff required 1)SEA-13 2)EA-19.Kendra is not in position to releive the staff under order of transfer. The matter is already withO/O ADG (NZ) .
17/05/2012 18:49:31
 
11
85x3 A.C.Plant has been commissioned by O/O ADG(NZ)TVP,The plant is giving frequent problem since its commissioning.Kendra has informed to M/S Blue star to submit a revised CAMC inculding AHU,Cooling tower etc.but the same has not been received by the firm. Water softening plant for A.C.Plant commissioned by O/O ADG(NZ) is not working on its full capacity firm has informed to repair the same under warrenty.The matter is already with O/O ADG(NZ) & DG:DD.
17/05/2012 19:01:33
 
12
Auction of OB VAN/ Scrape of old A.C.Plant:To auction these material one member from O/O ADG(NZ) & one member is required as committee member,nos. of letter have been written in this regard.
17/05/2012 19:09:52
 
13
Funds requirment:Rs. 7.90 lac & 13.50 under subhead MW & MEPT SBG FY2012-13 is granted Addtional requirment has been given for Rs 52 lac and 36.50 under subhead MW and METP to DG:DD.
17/05/2012 19:16:41
 
14
Non submission of Bills & Verifiction of work done by CCW:Nos. of works has been completed by CCW in the year 2010-11,2011-12. The woks has not been completed by CCWThe bills has not been submitted by CCW,& work done required to be verified.Nos of bills are pending .
17/05/2012 19:26:27
 
15
Earth Station status:a) MCPC status is not clear b) Two encoder were sent to CE(NZ) for repair(out of which one is loan from EBU),has not been received back from O/O ADG(NZ). Spare of 2.25 TWTA are required.
17/05/2012 19:33:06
 
16
Requirment of split A.C.: 10 nos of 2 ton Split A.C. are urgently required in technical area of CPC Viz. 6 nos. in Earth station.Cental A.C. plant duct are not available in earth station AVN & MCPC HPA rooms.
17/05/2012 19:38:05
DDK - DD NEWS DELHI
1
DDK - DTH Earth Stn. Todapur
1
The project for Workshop and DTT E/S are to be started in new DTH Building.The station is not having sufficient staff for existing DTH transmission, and it will be impossible to spare staff for activities from new building. It is requested that sanction for additional staff for performing duties in new DTH Building may please be provided in advance before the installation gets completed.
16/03/2012 12:31:05
 
2
In view of the severe shortage of staff and officers, the maintenance work is badly affected. The position has reached to an alarming level. Officers from the station are transferred without their replacements. It needs to be reviewed.
16/03/2012 12:41:27
 
3
The Scopus equipment installed with 20 channel DTH System are giving frequent problems. Reliable technical support from the authorized representative of OEM for these equipment is not available. Necessary steps need to be taken to eiher replace these equipments as planned earlier by DG:DD, or some firm may please be authorised for giving technical support of these equipment.
03/05/2012 12:26:59
 
4
There is frequent interference on DTH Transponders of INSAT 4B Satellite. The case has already been reported by the station to all concerned. It needs to be taken up at higher levels to stop this unauthorized usage of the spectrum by somebody else.
03/05/2012 12:29:33
 
5
In case the DTH Setup is not shifted to new DTH Building, all the air-conditioners installed in technical area of the old building needs to be replaced with new ones on priority basis.
03/05/2012 12:31:36
DDK ALLAHABAD
1
Studio: Mini-DV ENG cameras required to be replaced with DVC-pro ENG cameras or advance version of ENG cameras. For compatibility 12 DVC-pro VCRs are required, which includes need of VCRs for 5 cluster LPTs of DDK Allahabad.
30/01/2012 16:52:08
 
2
Studio: LT power supply cable is required for replacement of defective one from HT transformer to LT panel. Specificarions are 4 core X 240 mm X 100 metre suitably armoured.
30/01/2012 16:52:56
 
3
Rs. 2,18,000 has been granted as SBG of routine METP for the FY 2012-13, which is not even sufficient for payment of AMCs of air-conditioners. This SBG allows an expenditure of around Rs.18,000 per month as per 1/12th norms of finance wing. The kendra is already having pending bill payment of Rs.1,50,000 from last financial year, which could not be paid due to paucity of funds. It is mentioned last years SBG was Rs.2,08,000 only . Therferefore , it is requested that SBG of METP in 2012 -13 may kindly be incresed to atleast Rs. 5,00,000.
30/01/2012 16:53:22
 
4
Studio: A latest version of NLE suit is required, as existing one is defective on the issue of hardware & software problems.
30/01/2012 16:53:49
 
5
Transmitter: Allahabad is having two THOMCAST transmitters, completed their useful life. Many spares (mainly transistor BLF 278) are required to run the transmitters on full power. PCB of QDP (quick display panel)is urgently required for monitoring the health of the transmitters.
30/01/2012 16:54:16
 
6
Damaged acoustic treatment of 150 sq m Studio at DDK Allahabad needs replacement.
04/05/2012 09:07:37
 
7
Atleast one 17 Ton air cooled plant is required as replacement of old 10 Ton water cooled plant which is beyond economical repairs. This is required for technical area like PCR, CCU, VTR room etc where new equipments installed under digitalisation scheme of studio.
04/05/2012 09:11:51
DDK BAREILLY
1
Requirement of new Dehydrator-1No. for 20kW UHF DDNews Transmitter. Andrew dehydrator was defective since long due to non avaiability of spares.
27/01/2012 17:31:12
 
2
28V,52A Digitronics P/S -2Nos. are required for DDNational BEL Mark III 10kW VHF XTR .
27/01/2012 17:35:07
 
3
300pF,10KVDC Capacitor for 8F Cavity is urgently required, no spare of this capacitor is available in store DDK Bareilly. Failure of this capacitor may cause BD in service to 1KW.
27/01/2012 17:38:51
 
4
Two nos. of Computer Dual Core 2 model with printer & UPS are required for smooth usage of internet to reply of NZ & DD Directorate .
27/01/2012 17:40:51
 
5
DDNews R &S spares: Exciter P/S-1No., Wire joining strips-10Nos. in PUC panel are required
27/01/2012 17:44:31
DDK CHANDIGARH
1
REPAIR WORK STUDIO • Blower of one A/C plant 16.5 Ton, Make Blue Star is defective and giving high noise and low pressure. • Plura Monitors giving software problem. TRANSMITTER • Synthesizer Unit of stand by exciter is faulty. It was sent to GCEL for repairing but it is still faulty. • DP of standby exciter is faulty. • 2 Nos. 500 W PA of GCEL Transmitter were sent to maintenance wing of ADG(E) North Zone for repairing. • One PA Model Weble / GCEL giving mismatching. EARTH STATION • Encoder Harnes, Make Scientific Atlanta of existing Earth Station is defective and require repairing. • HPA, 2 Nos. of earth station were sent to DDK Delhi for repairing. One is diverted to DDK Hissar, but no communication / receipt received from station till date about second HPA of earth station. GENERAL • Due to lightening problem, three modules of Audio Console (Make Calrac) are faulty (Monitoring Card Nos. ML 4952, ML 4953 and Input Module P85539) and requires repairing. • ADA Card, Make Network, Part No. E204460, ML94V-O.1770, Qty. One No. is defective due to lightening; requires repairing. • Advance Video S/P Card is defective and requires repairing.
09/05/2012 16:03:54
 
2
REQUIREMENT STUDIO • Cassette compartment of DVC Pro 455 of new studio. • 3 Nos. Camera Chain for new studio. • ADA Cards, 3 Nos., Make Network, Part No. E204460, ML94V-O.1770 • Minimum 3 VCRs (DVC Pro 50) required – one for NLE and two for edit suits. • 16 Channel digital vision mixer is required for old studio set up for digitalization. • 3 Nos. New Camera Chain is awaited for digitalized chain. • New VCRs (DVC Pro 50) atleast 7 Nos. are required for old setup. • OB equipments are required at station a) Audio Console 8 Channel 1 No. b) Vision Mixer 8 Channel 1 No. c) D/G Set 10 KVA portable 1 No. d) A to D 4 No. e) D to A 4 No. f) SPG 1 No. g) Monitors LCD 8 No. h) WF Monitor 2 No. i) C G 1 No. j) Ampli Speaker 4 No. k) Mon. Amp. 1 No. • Optical Fibre Link is required for DDK Chandigarh from a) Studio B (Old) to Earth Station (New) - approx. distance 75 M Earth Station(old) to Studio B (Old) - approx. distance 35 M Studio B (old) to Transmitter (old) - approx. distance 25 M Studio B (old) to Transmitter (New) - approx. distance 70 M b) Studio A (new) to Earth Station (new) - approx. distance 71 M Earth Station (new) to Studio A (New) - approx. distance 71 M Studio A (new) to Transmitter (old) - approx. distance 85 M Studio A (new) to Transmitter (new) - approx. distance 65 M c) Studio A (new) to Studio B (old) - approx. distance 91 M Studio B (old) to Studio A (new) - approx. distance 91 M • RF Evolution 3000 Series communication receiver with RF Lapel (1 transmitter – 8 receivers) required for station. • Microphones required at station a) RF Lapel, 8 Nos. b) Dynamic Mic, 6 Nos. c) Boom Mic 1-1/2”, 2 Nos. d) Omini directional Mic, 3 Nos. • Monitoring amp. With speaker required for studio B (old), Edit Suit and Studio A (new), 3 Nos. • ADA 3 Nos. for Studio B (old) required. • SDI to Analog Convertor, 4 Nos. • Analog to SDI Convertor, 4 Nos. • SDI to composite converter (2 mirinda) required. • 4 Nos. of A/C 2 Ton of old PCR of studio B requires replacement. TRANSMITTER • 100 Meter RF Cable is required for shifting of transmitter from old building to new building (mast height is 45 metre). • 10/20/50/100 W elements required for transmitter. • 3 Nos. IRDs are required • Upgradation of transmitter required. • RF Transistors required – MRF 377 (4 Nos.), 530X (4 Nos.), 534W (2 Nos.), 543 (2Nos.) EARTH STATION • New Earth Station room is ready for installation. New Earth Station (1+1) is required with UPS. (Its DP was May 2012) • PDA of old earth station setup is required to be shifted at new site (which was decided by DG:DD) near new earth station. • 2 Nos. Motorised Receiver PDA required at station. GENERAL • Measuring equipment for new studio setup a) 2 sets each of Audio Analyser & Audio Generator b) 1 No. Satellite Tracker c) 1 No. RF Power Meter d) 2 Nos. VITS inseter cum generator e) 1 No. RF Analyser cum field strength meter / Site Master f) Spectrum Analyzer 20 GHz / 7 GHz g) 1 Set Earth Resistance Meter, Make Fluke h) 1 No. Desoldering Station (3 RM) Make Weller i) 1 No. CRO dual beam, 1 GHz j) Variac 0 to 300 V AC, 3 Nos. k) DC Multimeter, Make Fluke, 1 No. l) Clamp On Meter, 1 No. • DG Set 62.5 KVA required for old studio set up (old one was diverted to HPT Bikaner vide Diversion Order No. 2/4/DDM/Doordarshan Kendra Chd./2011-12 dated 14.12.2011 of ADG(E) North Zone. • 10 Nos. Desktop Computers are required for officers / work. • Upgradation of receivers (LCDs) is required for station (A) 32” LCDs, Qty. 6 Nos. (B) 26” LCDs, Qty. 22 Nos. • Book Shelf, Full Size, 4 Nos. for Tech. books. • Almirah, Full Size, 4 Nos. for technical maintenance. • P/S for maintenance of range 0 to 30 Volt 15A / 10 A, 2 Nos. • Anti Static Mats, 5 Nos.
09/05/2012 16:05:16
 
3
CIVIL CONSTRUCTION WING (ELECTRICAL) REPAIR WORK • Electrical wiring of ASF (new studio) is not working properly. Short circuits are observed at many points due to which many electrical circuits are not working in different areas / rooms. Executive Engineer, CCW (E) has been informed about the problem. • Fire Alarm Display of new building of ASF is not working till its handing over. Company was informed about the problem. XEN, CCW (E) asked to take up the matter with suppliers. • Three street lights at back side of ASF are not working. REQUIREMENTS • Estimates required to be submitted for Staff Quarters as per new CPWD norms. • A/C points and wiring for 5 partitions are required at ASF building. • Wire Frame Bus Bar to main S/P of blocks required to be changed at DD Colony, Sector 42-A. • Complete set of wiring diagrams for ASF to be provided to the station.
09/05/2012 16:05:54
 
4
CIVIL CONSTRUCTION WING (CIVIL) • Staff Quarters are required to be upgraded as per new CPWD norms. • Road in front of colony required to be repaired. • Toilet space in “D” Type quarters required to be changed to English Type / Anglo Indian Type. • Water and sewerage connection from Chandigarh Administration still pending. Action to be taken by CCW (C). • Complete drawing set of new & old building required including water pipe lines and sewerage lines. • Final completion / partial completion of building is required (for water & sewerage connections) from Chandigarh Administration. • Water tank capacity of staff quarters at Sector 42-A is required to be increased. For “D” Type - upto 1000 ltrs. For “C” Type - upto 750 ltrs. • Main gate of staff colony at Sector 37 is required to be increased for the purpose of entry of four wheelers. • Covering of linking corridor at first floor from old building to new building is required. • Construction of Guest House / Inspection Quarters at Sector 43 is still pending from CCW’s end. • Car Parking Shed for staff vehicles is required to be increased at least for additional 12 four wheelers. • Land area below mast (between old and new building) required to be filled with interlocking pavers (hole type). • Horticulture of the surrounding areas of the building is required to be done to give good look to the complex / building. • Main entry of old building required to be improved.
09/05/2012 16:06:43
DDK DEHRADUN
1
HPA (750W) make xycom is available with Eltel pvt.Ltd Banglore for repairing since Jan 2009 due to fault in TWT. The matter may please be taken up.
24/01/2012 16:17:47
 
2
DDK Dehradun required 02 Nos Edit VCR (DVC pro 25/50) as spare unit for smooth functioning of Kendra
24/01/2012 16:19:40
 
3
DDK Dehradun required one cut to cut linear edit suit urgently
24/01/2012 16:21:41
 
4
Two nos of Studio camera are urgently required at DDK Dehradun
24/01/2012 16:22:51
 
5
One portable teleprompter is also required at DDK Dehradun for VVIP outdoor coverage .
24/01/2012 16:35:42
 
6
SDI cards for DVC Pro 25 VTR for model No ADJ755,455 & 850 are required urgently .Two SDI cards may be provided for each model.
24/01/2012 16:38:35
 
7
20 KVA UPS make Dubas has served its normal working life & needs replacement due to unavailability of spares . The company has also denied for extention of further AMC .
24/01/2012 16:43:05
DDK DELHI
1
Procurement of Spares through CP&S: Doordarshan Kendra Delhi is executing several assignments of very urgent nature very often given by the Prime Minister’s House, MIB, Directorate and other higher offices. On several occasion several assignments need to be carried out simultaneously. Therefore, It is requested that DDK Delhi may be permitted to submit indent to DG:DD (Studio O&M) and approval may be issued to procure spares through CP&S.
20/04/2012 10:15:25
 
2
Provision of Mobile Phones: All the Station Engineers at the Kendra have been given important assignments. The Kendra has to execute several assignments of very urgent nature. On many occasion several assignments need to be carried out simultaneously. All these assignments need effective communication for seamless coordination and proper implementation. It is therefore felt that the sanction for mobile phones to all the station engineers may be granted. It may also be mentioned here that all the station engineers are also not provided with residential telephones. Telephone reimbursement scheme as followed by DG:DD may also extended to the Kendra.
20/04/2012 10:16:47
 
3
Digital Professional IRDs with Multi Format: DDK Delhi has been using C - Band Professional IRDs for the last ten to eleven years for receiving signals. Majority of these IRDs have become unreliable for long duration operation & need frequent repair. On several occasions during VVIPs Live telecasts, online IRDs got hanged resulting in interruption in the Live telecast. The Kendra continues to downlink international events majority of which are uplinked with DVB-S2, HD/SD, MPEG-2/4 format. The cricket matches which are earning large revenue for Prasar Bharati are also received with these formats. This necessitates introduction of peripheral device in the circuit resulting in reduction of reliability in the system. Keeping all these in view, it is requested that at least 12 numbers of Professional Digital Integrated Receivers with facility to decode both RAS and BISS encryption may kindly be provided to the Kendra as special case.
20/04/2012 10:18:15
 
4
Replacement of MBS Servers and Software Up-gradation of DVB-H System: MBS servers of DVBH were commissioned in May 2007. New software version of DVBH Platform is already released and OEM is not in position to provide technical support of old version of software. Therefore, it is requested to upgrade software and replace the MBS Servers at the earliest.
20/04/2012 10:19:27
 
5
Spares for NEC 5KW DVB-H Transmitter: Six PAs have become faulty. Their power supply boards bearing part no. 3546P09434A (1/2)/NJD-6417 need replacement. Approximate Expenditureof Rs. 30.00 Lakhs
20/04/2012 10:20:53
 
6
Spares for (8+1) Earth Station: (8+1) Earth Station was commissioned in Feb 2007 and warranty period of all equipments completed. Kendra has not received any spares till date. It is therefore, requested to provide spares for upgraded multi pass Encoder (E-5770), modulator (M-5600), Up-converter, HPA etc.
20/04/2012 10:22:26
 
7
Replacement of EFP DSNG Van: The EFP DSNG Van having the first ADVENT C-Band Flyway fitted in it and C-Band Flyway with this Kendra has been in continuous operations since the past 13 years and require urgent change in its Encoders cum Modulators, up-convertors and monitoring IRD (for seeing the MOD output) presently not in operation due to these devices out of production as on today with theoretically no service support by M/s HBE (Authorized dealer of Advent). a. It is proposed to replace these by DVB S-2 Complaint devices in both the DSNG Packs. b. The XICOM HPA is also equally old and requires replacement by equivalent SSPA.
20/04/2012 10:23:07
 
8
Diversion of OB Van to CPC: Diversion of Digital OB Van procured via AT 6(43)/97-98(P)/P cell dated 27.02.98 has been diverted to DD Sports CPC along with maintenance Staff. The OB van is ready for handover. Instruction may be issued to CPC to take over OB Van at the earliest.
20/04/2012 10:24:32
 
9
Requirement of Wide Angle Lens: Presently during each OB event invariably wide angle lenses are desired by the production counterparts hence at least three nos. wide angle lens with zoom ration of 11X or 14X with minimum focal length of 4.2.- 4.5 are required. Similarly, Three wide angle lenses are required for Studio# L and ENG sections of News. It is therefore proposed that approval for 6 numbers of SD wide angle lenses may be accorded. Amount: Rs. 50.00 Lakh.
20/04/2012 10:25:16
 
10
Robotic Camera Setup at Parliament Rajya Sabha: The Eight Camera (Thompson TTV 1657) & Robotic setup (Make Radyne) of Parliament Rajya Sabha was installed in 1996 and has been in operation since then . Presently there is no technical support in respect neither the Camera nor the Robotics by OEM due to these being discontinued from further Production. At present only three Camera chains are operational out of eight required for smooth coverage of the house proceedings. The set up is managed with great difficulty and requires urgent replacement. There is no scope of adding any manual camera chain with cameraman inside the Rajya Sabha Camber. Requests have been sent to DG:DD and this needs urgent attention.
20/04/2012 10:26:45
 
11
Spare Parts of DVCPRO VCRs: There are many DVCPRO VCRs which are lying defective at the Kendra due to non availability of spares. The load on VCRs has substantially increased due to shifting DD News and ever increasing requirement of the Directorate for technical preview and other similar activities. It is therefore requested that proposal already sent to ADG(E-NZ) for procurement of Electro Mechanical spares and Upper Drum assembly may please be approved. Amount: Rs. 60.00 Lakhs.
20/04/2012 10:28:11
 
12
Digitalization of Cable TV system at PMH and DD Bhawan. As per mandate issued by GoI , the entire analog Cable TV system has to be upgraded to digital by 30th June 2012. It is proposed to hire a consultant for preparing a detailed project report along with the estimated cost for implementation as per GOI Guidelines. Estimated cost for Consultancy may be approx. Rs. 50000/- (Rs. Fifty Thousand Only)
20/04/2012 10:28:58
 
13
Requirement of LCD/TV sets for Monitoring of DD channels. An indent has already been placed with DG DD for supply of 24 nos. of 21” CTV sets as replacement of liquidated /auctioned TV sets. As CRT TV sets are now a days obsolete, it is proposed to procure only 32” LCD/LED TV sets of reputed make so that they are maintainable for 8 to 10 year in future. Estimated cost for 24 nos. of 32” LCD TV sets : Rs. 8,50,000/- only.
20/04/2012 10:30:00
 
14
Replacement of Conventional CRT monitors in Studio PCR with Professional LCD/TFT monitors with HD/SD Input. The Kendra has three 24X7 channel transmission with their PCRs and MCR having only conventional type CRT monitors. These monitors have outlived their useful life and are difficult to maintain due to non availability of spares. They are also energy inefficient and hence they need to be replaced with modern energy efficient and eco friendly TFT LCD monitors with HD/SD Inputs. Requirement : 100 No 15’’ Monitors.
20/04/2012 10:31:10
 
15
Distributed Non Linear edit suits with attached Central Storage for efficient tapeless environment: In order to reduce use of VTRs and hence their spares, it is proposed to move to central server connected distributed NLE system so that recorded and edited footages are stored in server and need not be ingested in individual NLEs. A scheme under augmentation and maintenance of capital assets may be devised. Estimated cost : Rs. 100 lakh.
20/04/2012 10:32:11
DDK GORAKHPUR
1
For 10W NEC Transmitter:-DVC card (Part No.HPB-3103Dfor Exciter of NEC)- 01No., Control Power Supply (Part No.HH1-042607-214, For all control P/S) -01No., Air Pressure Switch (Part No.Pressure interlocking) -01 No., MOSFET of PA (2SK1543) (Part No.HV3-001932-005TRPA)- 10Nos., Fader Interface Board (For Console) -01No. For 1KW Thomcast Transmitter:- MOSFET – BLF 278 -10Nos., MOSFET – MRF 182-10Nos.,Transistor- BFG135A & BFR93A-5Nos. each, Absorber for PA (150W & 250 W)-5Nos. each, IC-ERA_4SM, ERA_5SM & ERA_2SM-5Nos. each, Pressure Switch-2Nos
25/01/2012 16:15:53
DDK HISSAR
1
No engineering staff sanction is available against DDK,HISAR and the technical activities are being managed with the staff sanctioned against LPT, Hisar and a few transferred posts from other stations .These available staff strength is not sufficeient to manage the large volume of work which includes running daily regional service,News bulletin, recording of programmes, ENG, coverage operation and maintenance of 20 KW UHF TV Transmitters DD National & DD News.Regular Sactioned of posts may be made available to this kendera or till such time more engineering posts be shifted from other stations.
31/01/2012 16:22:26
 
2
Earlier the building of DDK HISSAR was made running PGF Station but later when the station activities were started,RNU was also made operational at HISAR for running regional service networking of LPT & HPT in Haryana. These additional activities Which were not envisaged in PGF Scheme have occupied large space in the building and due to which no space is available for tape library and acomodation of office space for admin.,programme and engineering staff. The feasibility of additional construction in the building may be considred on prority basis.
31/01/2012 16:42:13
 
3
Digital production switcher may please be provided
31/01/2012 17:29:34
 
4
Spectrum analyzer has not been provided in Earth station at this kendra due to which difficulties are being faced in the measurements of Earth Station signals.It is requested that this may please be provided immediately for measurement purpose.
31/01/2012 17:44:07
 
5
Split Air conditioners 2T -12 nos.may please be provided for HPTs (DD#1& DD News)
31/01/2012 17:50:31
DDK JAIPUR
1
STUDIO SECTION
30/01/2012 16:55:10
 
2
Replacement of Cameras in Recording Studio: Initially recording studio was equipped with 4 Nos. of KCK 40 Cameras. These cameras were replaced by three HK-388 cameras and one ENG based JVC KY D29 was additionally integrated as fourth camera. These camera have outlived its useful life and service support as well as spares are not available to maintain them in working condition further. It is proposed that all four cameras may be replaced at the earliest for smooth working of studio.
30/01/2012 16:55:54
 
3
Replacement of OB Van Production Switcher: Production Switcher(Ross) of OB Van has completed its useful life and required to be replaced in near future.
30/01/2012 16:56:31
 
4
Replacement of leitch server: Transmission server leitch VR 445 provided at the Kendra has outlived its useful life and giving frequent problem. Server was out of order for a long time, which has been restored on 02.06.2011 with the efforts of dedicated team. No service support and spares are available to maintain it further. It need to be replaced on priority.
30/01/2012 16:56:58
 
5
Requirement of DVC Pro 50 Edit VCRs & its spare : I.This station is in acute shortage of DVC Pro 50 Edit VCRs. Only 18 VCRs are available. It is requested that seven more DVC Pro 50 Edit VCRs may be provided for smooth functioning of the system. II.There is urgent requirement of DVC Pro-50 VCRs parts also. Requisition has already been sent to Directorate. III.Software tools for DVCPRO-50 system:- The Kendra has integrated Panasonic DVC RPO-50 Mbps VTRs in transmission/recording chain and Edit suits. The alignment and software tools for DVC PRO 50 equipments are very much required to maintain all systems functional conforming to broadcast quality. The supplied tools/Jigs meant for DVCPRO-25 are not fully compatible with DVCPRO 50 equipments. IV.Replacement of 03 Nos. of Mini DV Camcorders :- Mini DV Camcorders are required at the Kendra as the earlier Mini DV Camcorders have outlived their useful life.
30/01/2012 16:58:16
 
6
Replacement of Communication System : The Kendra has two studio setup which were equipped with a single master unit DRAKE Communication System. It has failed about one year back and the recording transmission activities are being managed with an old electro dyne communication system with limited facilities. M/s DRAKE is no more providing any service support. It is therefore proposed to provide a new communication system (1+1) on priority. Proposal to supply the communication system on the basis of supply order placed by Directorate was sent to ADG-E(DDM)
30/01/2012 16:58:59
 
7
Pending Issue of News Room Script Automation System : •The facility of search and categorization of wire feed content in Hindi language is not available. Searching through a large number of wire feeds without proper categorization makes the system inefficient. Company replied that the categorization of Hindi wire is not possible for any newsroom system. However, the search facility in ENPS does allow searching for a wires containing specific text. The suggested solution is primitive and would be a key word search and not categorization. We may also take the comment from the OEM regarding similar requirement in other international languages. •Working of remote client along with local client is not done despite repeated reminders to firm.
30/01/2012 16:59:32
 
8
Additional requirements in OB Van: Up gradation of OB Van: •Provision of Under Monitoring Display systems, Tally distributor. •Replacement of Tripods of OB Van Sport cam Cameras – 02 Nos. . Replacement of EVS system: The EVS Slow Motion System is out of order and no OEM support is available. It is proposed that it may be replaced on priority. Replacement of OB Van AC plants (2.5 Ton) - 02 Nos. These plants are very old and giving frequent problem.
30/01/2012 17:00:30
 
9
Replacement of central AC plan: •Two out of four 55 Ton AC plants installed in 1987 have been replaced by two 85 Ton plant. Remaining two 55 Ton plant need to be replaced on priority. Proposal for replacement of old plant has already been sent to ADG-E(Project). •Three AHUs out of four has already been replaced. Fourth AHU installed for the area of first floor need to be replaced on priority, as air flow of this AHU has been reduced to less than 50 percent.
30/01/2012 17:01:09
 
10
Replacement of Sub Station Equipments: Sub Station Equipments were installed in 1985 and have served their useful life. It is proposed that its HT OCBs, LT ACBs and other Switch Gear with panel except transformers may be replaced as switch gears are giving frequent problem and spare are not available to maintain them further.
30/01/2012 17:01:38
 
11
Provision of Early Fire Alarm System : High power transmitters, Earth Station and News Room setup is not having any early fire alarm system. It is proposed to provide three independent early fire alarm system for these setups.
30/01/2012 17:02:04
 
12
Provision of Surge Protection System : The Studios are equipped with software based sophisticated equipments and no surge protection system is provided at the studios. It is therefore proposed to provide a Surge Protection System.
30/01/2012 17:02:26
 
13
Requirement of Virtual Set : To improve the production quality of the programmes virtual set is required at the Kendra.
30/01/2012 17:02:52
 
14
SATELLITE SECTION
30/01/2012 17:03:21
 
15
The DSNG is not being used due to the non clearance of U/L (Ku-Band frequency) from NOCC.
30/01/2012 17:03:44
 
16
TRANSMITTER SECTION
30/01/2012 17:04:42
 
17
Structural drawing of the guyed tower of HPT Jaipur is not available at the Kendra as it is required to know load bearing capacity for sharing tower with DTT/Mobile Operator.
30/01/2012 17:05:27
 
18
Elements of the surge protection system are required, proposal has already been sent to ADG(E-NZ).
30/01/2012 17:06:53
 
19
Kendra requires MOSFET 2SK1543(56 Nos.) & Circulators Model HQ-2-013406-001, 170-230 MHz – 20 Nos. & Circulators Model HQ-2-012451-501, 168-230 MHz – 10 Nos.
30/01/2012 17:10:57
 
20
OTHERS
30/01/2012 17:11:59
 
21
Augmentation of Facilities : The following special repair works are required to be carried out for which architectural drawings are awaited.
30/01/2012 17:12:58
 
22
Augmentation of Parking at DDK premises. Parking facility for four wheeler of the staff is not adequate. It is proposed to provide under ground parking system which may cost Rs. 40 Lacs.
30/01/2012 17:13:36
 
23
Requirement of Staff:- •The Kendra is facing acute shortage of staff in the cadre of EAs and Helpers. In EA cadre only 13 posts are filled out of 39 & in helper cadre 16 out of 28 are filled. This is affecting operation and maintenance activities at the Kendra. •Due to shortage of Helpers there is need for their recruitment. For the time being we may be allowed to hire the labour to do the work of Helper on contract basis.
30/01/2012 17:15:51
 
24
Disposal of Stores:- ADG(E-NZ) forwarded a list of 14 capital items to Directorate on March 2006. The Directorate approval on write-off capital items is awaited for a long time. Also various proposals are being sent to ADG(E-NZ) for approval of write-off are also pending. In absence of approval of write-off condemned items are occupying useful space of the Kendra.
30/01/2012 17:16:36
 
25
Requirement of Peripherals:- •Requirement of 14”/15” Monitors(TFT) - 40 Nos. •Requirement of Portable teleprompter for Governor, C.M. & VVIP Coverages. •Replacement of old TV set by LCD TV 26” & 32” - 25 Nos.
30/01/2012 17:17:20
 
26
The work of replacement of damaged roof of old transmitter hall and adjoining area is in progress. CCW(E) has submitted an estimate of Rs. 8.5 lacs for associated electrical works. Sanction for the same may be expedited so that this work can also be taken up simultaneously.
08/05/2012 15:53:43
DDK JALANDHAR
1
Replacement of St. B and St. C cameras :- Cameras of studio-B & C are of analog outputs supplied in 1997 & have served their life. As DDK, Jalandhar is having completed digital chain except these studio cameras. Hence, three nos. cameras for studio-B & two Nos. for studio-C are required to complete the digital chain.
19/03/2012 11:56:41
 
2
Replacement of audio console in studio-C :- Audio console of studio-C (Webel make) was giving frequent trouble and to meet the urgency the standby audio console of OB van is being used. Replacement of audio console for St-C is urgently required. This issue was also raised during last zonal conference.
19/03/2012 11:58:46
 
3
Requirement of MDUs for improving the power distribution system in studios:- At present all the equipments, racks have old distribution system. There each equipment power cable has to be soldered. This system has to be replaced by 19” 1RU IEC to IEC Power distribution MDUs.
19/03/2012 11:59:29
 
4
Master/Slave clocks :- At present we are using obsolete NAINA make master clock (1981) which has already served its useful life, need a regular mtc. & time has also to be set regularly. Few of its units have already discarded as become beyond repair. One master clock & 36 slave clocks are required.
19/03/2012 11:59:58
 
5
Requirement of 32x32 SDI router:- With the addition of no. of online NLEs/Servers and down linked satellite channels along with the existing video s of different studios/VCRs, to & fro lines between studio & ES play back, the no. of video input & output has increased manifold. The existing 16x16 SDI routers becomes in sufficient & hence the requirement of 32x32 SDI router is justified.
19/03/2012 12:00:28
 
6
Audio monitoring amplifier along with delay lines & speakers :- No. of times mega shows are being arranged in studio-A. The available facility for monitoring of audio for the audience in studio-A is not able to give right ambience & the feel of the programme is lost. To improve the monitoring quality, monitoring amplifier of about 10000 Watt output & four column type speakers of each of 2000 Watt & two monitoring type speakers each 500 Watt capacity is urgently required.
19/03/2012 12:01:06
 
7
Sync Studio :- Kendra has been supplied 8 channel hard disk based sound recording system. As a result of which the utilization of sync studio has once again revived. The sync studio was not in use since last many years & was not meeting the technical requirement. The refurbishing of studio is urgently required.
19/03/2012 12:01:35
 
8
Acoustic Treatment of studio-A :- Since beginning studio-A is not acoustically treated from time to time need has been felt for complete acoustic treatment.
19/03/2012 12:03:03
 
9
Requirement of peripherals:- The requirement was projected for analog VDA/SDI to composite and component converters & SDI Quad Splitter, vide letter no. DDK/JAL/2011-12 /9354 dated 6.1.2012. The peripherals are urgently required to stream line the studio chain.
19/03/2012 12:03:36
 
10
11. LSM of OB Van is faulty :- The OB Van of DDK, Jalandhar has been regularly deployed for the sports coverages. For any sports coverage the slow motion is the mandatory requirement. The LSM supplied is more than 10 years old and very frequently fails. During the workshop at DDK, Delhi for LSM organized by M/S Shaf Broadcast, they have shown their inability to rectify the problem. One LSM make EVS is urgently required. Letter sent to CE(NZ) and DG, DD vide letter no. DDK/JAL/DDE/2011-12/9333-34 dated 6.1.2012.
19/03/2012 12:22:29
 
11
Disposal of Mumbai OB Van :- The OB Van of DDK Mumbai is lying unused in dilapidated condition since last 16 years at DDK, Jalandhar. In the last Zonal conference , it was decided that the van has to be cannibalized for its disposal. Necessary guidelines from the Directorate in this regard is still awaited.
19/03/2012 12:27:59
 
12
Replacement of OB Van :- The OB Van of DDK, Jalandhar is more than 25 years old (procured during Asian Games). All the vans procured during Asian games and allotted to various kendras have already been rested. Even the documents like RC/Insurance of the present OB vehicle are not available. This issue was raised in last two zonal conferences.
19/03/2012 15:18:23
 
13
Thomson camera model 1657D :- The performance of Thomson cameras of OB Van are not up to mark particularly during night coverages as their sensitivity is poor in comparison to Sony DXD-50 or similar cameras.
20/03/2012 12:34:13
 
14
Audio Snake Cable : - Five to six number of Audio cables need to be laid between OB Van to commentator booth, DSNG Van, Graphics Room etc. to reduce the labour of laying multiple cables. Audio snake six core need to be procured. Audio Snake Cable six core 200 mtrs. required.
20/03/2012 12:34:45
 
15
Video Snake Cable : - Five to six number of Video cables need to be laid between OB Van to commentator booth, DSNG Van, Graphics Room etc. to reduce the labour of laying multiple cables. Video snake six core need to be procured. Video Snake Cable six core 200 mtrs. required.
20/03/2012 12:35:18
 
16
Encoder/Modulator of DSNG Van: The DSNG van of DDK, Jalandhar is down since long for want of Encoder/Modulator. Both the Encoder/Modulator (Model No. 5740, S.No. 131,133) has been sent way back for repair to the authorized agency M/S Three DIS through zonal office. The third Encoder/Modulatorunit of DSNG is also down as intimated to zonal office.
20/03/2012 12:35:46
 
17
P/S Module of modulator SM 5600 :- The power supply module of modulator SM 5600 fails frequently. At present, Kendra is not having any spare PS module. Two nos. of such modules may please be supplied on priority as a standby.
20/03/2012 12:39:53
 
18
Studio # C Plants, 06 Nos. of Feeder Lloyd Make, of 3 Ton Capacity, have served their life and needs replacement.
20/03/2012 17:04:28
 
19
1.5 ton windows AC : AC Plant section have 18 nos. of window AC and all have already served their life. As they are all old, therefore needs replacement except 2 nos. of of window ACs of OB Van.
20/03/2012 17:05:06
 
20
1.5 Ton Split type ACs make Videocon installed at transmitters (10 Nos.) also needs replacement.
20/03/2012 17:07:55
 
21
PCB F-4, REC/PB , VEP-83629 one no. required for DVCPRO 50 VCR model 965.
22/03/2012 12:37:41
 
22
Cassette Compartment VXA-7949/8503, two Nos. for DVCPRO 50 VCR model 965.
22/03/2012 12:38:06
 
23
Cassette Compartment VXA-7343, three Nos. for DVCPRO VCR model 950/755/455.
22/03/2012 12:38:35
 
24
4 CH, Portable Audio Mixer with battery operated f for ENG coverages.
22/03/2012 12:40:02
 
25
Camera mounted Mini light LED type 8 nos. for ENG news coverages.
22/03/2012 12:41:53
 
26
Providing and fixing wire gauze shutters at Staff quarters DDK, Jalandhar under Augmentation & Replacement of Capital Asset
22/03/2012 12:43:17
 
27
Multiviewers for PCR A, B & C: Three Nos. of Multiviewers having atleast 24 nos. of HD/SDI inputs and 4 SDI outputs . Aspect ratio management of Pips, Audio monitoring and alarms. UMD and Tally updates, Clocks and Timers. Auto sensing Pal SDI 625 and HD-SDI allowing HDTV and Legacy signals to be used together, Quick startup with immediate video display. This is for saving space/area in PCRs and also to reduce the no. of cables.
23/03/2012 15:48:01
 
28
Replacement of Analogue Video Monitors in PCR A, B & C with 56” PLASMA having SDI/HDMI inputs for replacing analogue video monitors in monitor wall .
23/03/2012 15:48:31
DDK JAMMU
1
Replacement of 62.5 KVA & 125KVA generators at HPT and studio respectively .
27/01/2012 18:21:44
 
2
Requirement of Digital Camera chains for both the studios.
27/01/2012 18:23:22
 
3
VCRs are required for the editting booth for new studio.
27/01/2012 18:29:17
 
4
Flooring of transmitter hall
03/05/2012 16:34:05
 
5
Anti termite treatment of ASF building.
03/05/2012 16:35:09
 
6
Maintenance of security guards quarters at HPT .
03/05/2012 16:37:01
DDK LEH
1
Transmitter : (1)Replacement of 1KW(Ch# 11) transmitter Model: BEL/HVV166 is required as it is valve type transmitter and its spares are not available. The fallowing spares are required for 1KW(Ch# 11) transmitter Model: BEL/HVV166 –(1)TV demodulator -01 no.(2)Transistor TPV3100-04 nos.(3)Exciter unit -01no (4) Valve BEL 4000CX or 7F - 02nos.
24/01/2012 16:00:45
 
2
Studio : The new DDK Leh is facing the problems due the following pending works at new DDK complex. (1) EPBX installation work is still pending by project wing. (2) Solar water system testing work is still pending by CCW (electrical). (3) Insulation work of water supply pipe from sump tank to over head tank and over head tank to staff quarters & office building is still pending by CCW(Civil). (4) Eight numbers puff insulation type storage tanks for staff quarters are still not supplied by CCW(civil). (5) The possibility of Water supply to New DDK campus from AIR campus and bore well survey for DDK Campus. The report is still pending by CCW Civil..(6)LED Monitor 21 inch for RF monitoring purpose Against the new studio-14” Video monitors (SDI) input 08 nos. for PCR, Studio digital cameras chain and rest 04 nos. DVC Pro VCRs are not received till now.
24/01/2012 16:06:41
 
3
The proposal for replacement of condemned vehicle is pending at DG:DD, New Delhi.
24/01/2012 16:08:20
 
4
A New water tanker is required as present tanker is more than 15 years old and insurance company is refused to cover the insurance of mention tanker.
24/01/2012 16:15:48
 
5
LED Monitor 21 inch for RF monitoring purpose at xtr, studio and earth satation... Qty- 6nos
08/05/2012 12:05:16
 
6
UPS Batteries for new studio has no bakup time. Batteries became defetive due to long storage during installation. So require urgent replacement. Details of battery: 12V/85AH, Type : 12ALO85, VRLA, Make- Amaron Quanta - 32 Nos.
11/05/2012 17:38:33
 
7
Desktop - 02 Nos and Laptop - 01 No. are required urgently as old one became obsolete and they can not be upgraded
11/05/2012 17:40:04
 
8
Sanction of HT connection for DDK, Leh colony is still awaited
11/05/2012 17:53:22
 
9
Scopus IRD requireodel 2900 for transmitter- 02 Nos.
11/05/2012 17:55:20
 
10
Additional fund is reuired for the 2012-13 METP - 1.77 lakhs P/S - 11.67 LAKHS Minor work - 1.5 lakhs
11/05/2012 18:02:41
 
11
Staff shortage of Engineering Asstt. and Sr. Engineering Asstt. Now the studio recording and ENG activity have been encreased at DDK Leh
11/05/2012 18:04:12
DDK LUCKNOW
1
Studios: 1:02No VGA to PAL convertor with Gen. Lock 2:01No 40 KVA UPS Replacement of old one 3: 02No 6KVA UPS
31/01/2012 12:19:20
 
2
DSNG C Band/KU Band: 1: 01 No. 200 watt KU Band HPA 2: 01No. Laptop with RS-232 port 3: 02 No. De-embedder(stand alone unit) 4: 01 No. Digital Wave form Monitor with video monitoring 5: 05 No. Professional IRDS. (01 No. for DSNG, 02 No.for studio,01 No for Earth Station,01No. for XTR)
31/01/2012 12:27:44
 
3
ENG: 1:Head cylinder Unit a; VEG1337 For AJSD 850E 2No b:VEG1498 For AJSD455 2No c:VEG 1689 For Camera AJSDC-905E 2No d:VEG 1617 For Camera AJSDC-615 2No 2:Cassette compartment VXA7949 2No 3:Mother Board for camera AJD910 VEP00Z41/VJB00Z41 1No 4:CCD Pulse Board VJB20768 for camera AJD910 1No 5:Servo Board a:VCR AJSD-750 2No b:VCR AJSD93E 1No c:VCR 965E 1No
31/01/2012 12:45:38
 
4
Earth Station: 1:01 No. Digital Audio limiter 2:01 No. 400 Watt HPA 3:01 No. P/S unit for viper 442 model optical Fiber Tx/Rxunit 4:576 Batteries(2v,80Ah) for 02x40 KVA PCI make UPS
31/01/2012 12:53:52
 
5
Minor Works: 1: External painting of DDK colony.2: Providing of vitrified flooring tiles in the rooms of 2nd and 3rd floor of office building 3: Renovation of Reception Room 4:Providing vitrified tiles flooring & aluminium partition in corridores of service block at studio. 5: providing False ceiling in corridores of studio Building. 6:Renovation of rehearsal room in studio.
31/01/2012 13:07:42
 
6
HPT: 1: Independent feeder
31/01/2012 13:17:26
 
7
SPLIT ACS: 1: Transmiter 2-Ton 5Nos 2: Studios NLEs rooms 1.5Ton 4Nos 2Ton 1No. 3:Video tape Library 2Ton 3Nos 4:Earth station 2Ton 4Nos
04/05/2012 16:51:47
 
8
Central Ac Plant 1:AHU for ENG Floor 10700CFM 2:AHU For Studio B 14000CFM 3:cooling Tower 320USGPM 4:Chiller 100TR.
04/05/2012 16:56:16
DDK MATHURA
1
25kva AVR is requierd for ddk setup , As the existing AVR is not working satisfactory . It has repared one time .
23/01/2012 13:39:15
 
2
Flooring of the both technical and non technical areas are required to change at DDK( PGF) Mathura
03/05/2012 13:03:25
 
3
Doors and side wall wooden work want to relace/repare at DDK (PGF) Mathura
03/05/2012 13:06:37
 
4
Digitalization work at the station ddk mathura has started in first week of march2012 ,but it is still uncomplete till now
03/05/2012 13:09:39
 
5
Mini Dv VTR professional DV for transferring BETA FORMAT to Mini DV for NEWS purpose . The existing ( Mini DV VTR BR-DV6000E Professional DV)only one such VTR is not in working condition -2 Nos required at DDK(PGF) Mathura.
04/05/2012 12:36:12
DDK MAU
1
(1) List of Spares required for HPT Mau For 5KW GCEL Transmitter Transistor TPS 1028(Part No.9338825 90682)-20Nos., CA 5800(Part No.9338824 60682)-10 Nos.,Shunt & Bounce PCB(Part No.391346677200) -05 Nos., Gain Stab P/S 12V PCB(Part No.391346677090)-05 Nos., IC MAX 25-10Nos.
25/01/2012 16:33:51
DDK PATIALA
1
Monitors: The Kendra is provided with 14’’ colour TV. Actual video quality cannot be monitored. Kindly provide 2 Nos.14 ‘’ monitors.
27/03/2012 10:57:57
 
2
Cool Lights: Kindly provide following cool lights (a) 55Wx6 = 4 Nos. (b) 55Wx4 = 4 Nos.
27/03/2012 10:58:28
 
3
Cyclorama: The cyclorama in the studio has been torn from here & there. It is required to be replaced.
27/03/2012 10:59:04
 
4
Earth pits: 2 Nos. of Earth pits reqd. because the resistance of present earth pits on the higher side.
27/03/2012 10:59:53
 
5
Replacement of Acoustic: The acoustic in the studio is got damaged due to termite.
27/03/2012 11:00:20
 
6
Generator: This Kendra has no generator. 12.5 KVA generator is provided for LPT. It is for kind information please.
27/03/2012 11:01:50
DDK RAJOURI
1
No majour requirement except the payment of civil works that couldnot be made due to non availavility of LOC.
19/04/2012 09:38:16
DDK SHIMLA
1
Replacement of 1 KW BEL, Mark -III, transmitter is required as existing one is very old since 1994.
25/01/2012 14:52:54
 
2
Replacement of Diesel Generator, 62.5 KVA, 02 nos. (01 no. for Transmitter & 01 no. for Earth Station) of silent mode.
25/01/2012 14:54:50
 
3
Depute SE & subordinate staff against vacant posts.
25/01/2012 14:55:41
 
4
Painting of all PDAs.
29/05/2012 17:42:04
 
5
LCD/LED TV Receivers for HPT, DD(E), DD(P) -04 nos.
29/05/2012 17:44:47
 
6
Computer with accessories for transmitter.
29/05/2012 17:45:48
 
7
Replacement for existing mast lights with LED, Becon lights.
29/05/2012 17:46:46
 
8
Renovation of retiring room.
29/05/2012 17:51:34
 
9
Renovation of VIP bath room in office block
29/05/2012 17:52:32
 
10
Modification /beautification of toilets and bathrooms.
29/05/2012 17:53:10
 
11
Repair, painting and distempering of boundary wall, transmitter building, armed guard rooms.
29/05/2012 17:54:20
 
12
Creation of reception room in entrance of Administration block.
29/05/2012 17:56:20
DDK SRINAGAR
1
STUDIO & OB RELATED POINTS: 1. The lighting grid of Studio-1 of the Kendra has served its useful life and needs replacement. 2. Similarly, the fixed lighting grid of Studio-2 has outlived its useful life and needs replacement. Similarly, the provision of DMX control system may also be provided. 3. OB Van of the Kendra is very often deployed for sports coverages. Keeping in view the requirement of sports coverages, it is proposed that a 4-channel slow motion server may be provided. 4. There is a requirement of minimum 8 Nos of DVC PRO 50 Edit VCRs for meeting the requirement of OB/EFP Vans, Archive Cell and for addtional NLEs. 5. The existing three Ikegami HK388 Cameras have served their useful life. An ENG camera is also used during big recordings. It is requested that these may be replaced by latest digital cameras (04 Nos) 6. Only two cameras SK888 for the EFP Van have been provided. Keeping in view the minimum requirement of three cameras for EFP Van, it is proposed an additional similar camera may be provided. 7. The Kendra does not have any news automation system. The news is being telecast through conventional over-head camera and teleprompter. It is requested that ENPS system with facility of Urdu, Engligh & Hindi fonts may be provided to the Kendra. 8. There is no Video server available at the Kendra for telecast of regional transmission. A 4-channel video server with digital I/P & O/P facility may be provided to the Kendra. 9. The Kendra is in urgent need of Lapel (wired) Microphones. Four Nos of Lapel microphones may be provided on priority. Ident placed. 10. Existing Triax cables in OB Van need replacement. 400m and 300m length Triax cable (one each) are required with Lemo connectors. 11. Video Switcher available in PCR-2 does not have Digital Video Effects. DVE facility is needed during live telecast from OB Spot or other Kendra of the State. It is requested that one 16-channel digital video switcher with DVE facility may be provided to the Kendra.
21/03/2012 18:02:04
 
2
POWER SUPPLY RELATED POINTS: 1. The existing power swupply installation which includes LT panel and related installations at the Kendra have been done in very haphazard manner, resulting in numerous problems including frequent breakdowns. It is requested that a proper LT panel with the provision of ACBs and Bus couplers etc may be made. 2. Batteries of UPS being used in Studios and Earth Station were installed in April 2009. The 20KVA UPS (1+1) installed Earth Station has served its useful life and no maintenance support is available from OEM. Earth Station UPS may be replaced along with batteries on priority and Studio UPS batteries (make Amaron, 12V 42AH, 64 Nos) may be planned for replacement. It is requested that the battery bank be procured on buy back if possible.
21/03/2012 18:05:51
 
3
HEATING & AC PLANT: Heating Plant of the Kendra has been provided with a 200KVAAVR with input tolerance limits of 170 to 260 volts. As the input power supply voltage often drops much below 170 volts during winter, the heating plants cannot be switched on which results into severe interruption in the functioning including Studio recordings and live events from the Stuios. It is proposed that AVR may be replaced with another 200KVA with input tolerance limits of 90 to 270 volts per phase.
21/03/2012 18:08:13
 
4
TRANSMITTER RELATED POINTS: 1. 60 KVA (make APLAB, 03 Nos) UPS units installed at HPT are out of order since long. Detailed report has already been sent to the Zonal Office from time to time, but the firm is unable to put through all the UPS simultaneously. It is proposed that either th firm may be directed to repair the faulty UPS along with the battery bank immediately extended warranty or new set of UPS may be provided for smooth working of Transmitters. 2. Eight modules of Leitch ADAs are defective and the firms have declared them obsolete. It is proposed that three frames with 6 ADAs in each may be provided for smooth operation of Transmitters.
21/03/2012 18:11:23
 
5
FILLING UP OF VACANCIES OF STAFF AND TRAINING: 1. The working conditions at the Kendra arre very hard and considering that average rate of availing leave is very high, it is requested that all the vacant posts at the Kendra in the level of AE, EA and Sr. Tech may be filled for smooth functioning of the Kendra. It may be mentioned here that only 1 ASE out of 6 vacant posts are filled and 15 out of 21 AE posts are presently filled. Similarly, 10 posts of SEAs and 27 posts of EAs are vacant. This is causing severe operational problems. This may also be mentioned here that besides running 24-hour DD-Kashir channel, the Kendra has one OB Van, one EFP/DSNG Van, two Studios each with two shifts, ENG Section, Earth Station, Transmitters and other activities. 2.The training needs of the Kendra are not adequately addressed. The nomination of non-local employees of the Kendra is often not accepted by the Directorate/Zonal Office and the local employees are very few and the Kendra sometimes finds it difficult to spare them due to operational requirements. The lack of training therefore leads to under-utilization of the equipment and many operational and maintenance problems. It is, therefore, proposed that efforts may be made to arrange trainings locally at Srinagar Kendra to meet the requirement of training.
21/03/2012 18:17:19
DDK VARANASI
1
BUDGET RELATED :- Budget grant for the current fin.yr under subhead M/W, METP are inadequate. Curtailment is causing in maintenance of equipments and office building/Guest house/Staff Quarter.
05/04/2012 14:19:30
 
2
Painting of Transmitter building/office block and boundary walls:- The said painting works are to be required due to damage of old painting on the walls. The last painting works was done on last five year ago.
05/04/2012 14:34:32
 
3
Replacement/renovation of package type 15 tonx4 nos A/C conditioners:- Two nos. A/C plants were out of service due to rewinding/replacement of compressure unit out of four nos A/C plant and cooling tower fins are totally defective. Also required the fins of cooling tower replacement/renovation.
05/04/2012 14:42:02
 
4
Requirement of equipments :- 1.VM 700T -- for digital analog measurement. 2.RF field strength meter:- to assess the coverage area of Txrs. 3. Walki/Talki :- 12 yrs old set is defective.
05/04/2012 15:18:47
 
5
Spares of R&S Tx :-urgently required. 1.PUC unit. 2.Relay for PUC unit. 3. Fan for Power Amplifier. 4. Modulator unit. 5.Power supply for exciter unit. 6.power supply for prog. switcher unit.
05/04/2012 15:26:41
 
6
Spares of Thomcast Txr:-urgently required. 1.Load resistance-150 ohms/25W. 2. Transister- BLF 278 & MRF 182. 3. Pre Amplifier package. 4. Replacement/repairing of Demod unit. 5.Blower filter unit. 6. Exhaust fan for Duct.
05/04/2012 15:32:16
 
7
Studio Camera equipments :- Studio cameras of this center have served 14 yrs. Out of 03 cameras ( Hitachi-02 nos.,JVC-01 no) all the cameras base units were defective due to thundering/ lightening. Attempts were made for its repair including invited quotation from Delhi based as per suggestion of DD Directorate, but response could not be received as the equipment is out of manufacturing line. Studio Cameras may be replaced by new cameras.
05/04/2012 15:42:24
DMC ALMORA
1
Disposal of defective stores: A List of some defective articles such as old VLPT Batteries, Iron scrap etc, etc was pending for the sanction at CE/DG level. No response received from either side. Now we ourself decided to process the further action.
24/01/2012 11:07:49
 
2
6 KVA UPS: The internal modules of this UPS belonging to LPT Pithoragarh were sent for repair to M/s SNA Power Engineering, New Delhi (Near Malviya Nagar), under intimation to CE(NZ). The defective modules have been taken back without repair. One new UPS is required as assured by the Zonal Office.
24/01/2012 11:08:33
 
3
Supply of components: Some components, specially the uncommon ones and those fitted in the latest version equipments are not available in the local market. Neither the out side suppliers are interested in low quantity supply. Such type of components (diodes, Transistors, ICs, Solid State Relays, RF MOSFETs etc) may please be made available from the central stores. Sanction for the purchase of BLF 278, 4 Nos. Rs. 31,500 is still awaited
24/01/2012 11:08:51
 
4
DC Power Supply: One variable DC Power Supply 0-30 V/ 10 A is required for LPT Khetikhan 28 v 1 amp compact power supply 2 nos also required .
24/01/2012 11:09:11
 
5
Color TV Receivers: We sent a requirement of 7 Color TV Receivers to replace the 10 years or above old receivers. Only three LCD TVs were provided instead of 7. four more TV sets for VLPT Maneshwar, VLPT Dharchula, VLPT Bageshwar & VLPT Didihat are still required. now we are going to purchase the TV receivers at our level in the current fin year .
24/01/2012 11:09:32
 
6
New Diesel Generator: This is required for LPT Champawat to replace the seventeen year old 10 KVA Generator.
24/01/2012 11:09:55
 
7
New Vehicle: The Vehicle of DMC Almora was purchased in 1998 and has run two lakh & 8 thousand kilometers. The replacement is required.
24/01/2012 11:10:25
 
8
Earthing System: The old and poor earthing at various centers is required to be renovated.
24/01/2012 11:10:45
 
9
Tin Shed for DMC Vehicle: A proposal was sent to Zonal Office for the construction of a temporary Tin Shed in the Akashvani Campus. AIR authorities are not giving permission. The matter is at CE(NZ) level for the approval
24/01/2012 11:10:54
 
10
Sanction of CCW works. A total number of two civil estimates were sanctioned by the competent authority. One is construction of fencing at VLPT Munsyari and other one is construction of pathway at VLPT Almora. Only the work at VLPT Almora is under progress. Munsyari work is yet to be taken up
24/01/2012 11:11:54
 
11
VLPT Maneshwar: This is a long pending case. Condition of the building provided by state Govt. is very poor. The CCW, after on the site inspection, had proposed either to make complete new building or to erect a porta building. CCW has removed the installation of porta cabin from its work schedule. The decision is still awaited from the competent authority. Considering the urgency of work, the installation work of porta cabin may kindly be taken up by Zonal Office on priority.
24/01/2012 11:12:34
 
12
VLPT Bageshwar: This is also long pending case and has been put before the Additional Director General(NZ) frequently. The AIR Project Wing has taken the VLPT area for their FM installation. Now there is no space left for the Solar Panels. There is no space left to work on the PDA. There is a possibility of coming the PDA under the shadow of AIR building leading to blockade of satellite signals in future. AIR authorities may please be approached to provide room and open space for the VLPT transmitter, battery bank, retiring room( for maintenance team ) and solar pannels . presently solar charging is almost nil as the AIR Team has shifted all our solar pannels to such a place where no suitable sun light is available whole the day .
24/01/2012 11:13:00
 
13
LPT Khetikhan: The LPT situated near Indo- Nepal border is facing acute shortage of staff since its commissioning. There are two Txs. at this LPT, both for DD1 & DD News, and full transmission is being relayed where as there is only one Sr. Engg. Astt. posted to assist the Assistant Engineer who is also required to look after the works of DDO, DMC, Almora. Work is some how being managed by deputing staff from other LPTs/ VLPTs under control of this DMC. Sufficient staff may kindly be sanctioned and posted. FOR THE MEAN TIME SANCTION MAY BE GRANTED TO PUT THE CASUAL STAFF.
24/01/2012 11:40:36
 
14
Posting of EAs:- Four posts of EAs are lying vacant under DMC Almora out of which 1 Sr. Tech. has joined at LPT Pithoragarh against the vacant post of EA. and one EA has joined DMC Almora on date 02-05-2012. The vacant posts are urgently needed to be filled up.
24/01/2012 11:41:16
 
15
Proposal for construction of permanent building for DMC Almora may kindly be considered on priority as presently it is in a hired location. Ample land is available with AIR Almora.There will be considerable amount of savlngs in building rent etc. in addition to the facilities which can be developed for DMC workshop, stores etc. in a permanent set-up in AIR premises.
24/01/2012 12:11:39
 
16
Budget: The SBG 2012-13 is too less to meet the requirements of the DMC and its associated 14 nos of LPTs and VLPTs . It may please be enhanced as projected in the SBG requirement for SBG 2012-12.
24/01/2012 12:35:56
 
17
One channel convertor at LPT Champawat has become defective and not repairable. One channel convertor, Ch#7, Model No. GCEL -121-2 is required.
24/01/2012 14:31:17
 
18
Following modules are lying at Zonal work shop since 2009 for repair. 1- Station Control Unit, LPT Pithoragarh 2- Tx. Control Unit, LPT Pithoragarh 3- Band Pass Filter, LPT Pithoragarh 4- PSU of PA, VLPT Dewal 2 nos 5- Scopus IRD, LPT Champawat. Kindly send back above modules after repair
24/01/2012 14:31:38
 
19
The battery bank at VLPT Dewal is not working well because of ageing. This is also not Capable of giving proper supply to 50 W Tx. because it is only of 1250 Ah capacity where as it should be of 2500 Ah capacity. A new battery bank is required.
24/01/2012 14:31:57
 
20
Some equipments belonging to VLPT Dewal were sent to the zonal workshop in the year 2008-09 for repair. The D6 had supplied one 50 W PA power supply where as at least two No. of these are required.
25/01/2012 13:55:00
 
21
For VLPT Almora one No. of spare power supply for PA is required as spare. Model No. LVV 50, 50 W GCEL Transmitter. Also one spare PA is required as well. Model LVV50, GCEL. As we do not have any spare so in the event of emergency these spare units will be of great help.
03/05/2012 13:15:51
DMC ANANTNAG
1
BEL 500 W 1...Air conditioner = 02 nos required as both are defective. 2...UPS battery bank 12v/26Ah (20 nos). 3...PA Pallet amp (Part no.114002321893) = 02 nos 4...Driver pallet amp (Part no.114002420542) = 02 nos
14/02/2012 14:32:27
 
2
BEL 500 W 1... Since one generator out of two (14kva,sawafiji SH15D) is defective and spares are not available & it has already given overduo life ,so it is proposed that a new 15kva capacity generator may be provided. 2...UPS battery bank 12v/26Ah (20 nos) 3...PA Pallet amp (Part no.114002321893) = 02 nos 4...Driver pallet amp (Part no.114002420542) = 02 nos
26/03/2012 13:58:23
 
3
BEL 500 W 1... Since one generator out of two (14kva,sawafiji SH15D) is defective and spares are not available & it has already given overduo life ,so it is proposed that a new 15kva capacity generator may be provided 2... UPS battery bank 12v/26Ah (20 nos) 3...PA Pallet amp (Part no.114002321893) = 02 nos 4...Driver pallet amp (Part no.114002420542) = 02 nos
26/03/2012 13:59:39
 
4
GCEL 2X10 W 1...One complete PA ch.# 9 (+) 2...Battery bank (2.2v/2500AH) 3...Exciter units = Vision mod ,Aural mod,Video processor,IF combiner,IF corrector & DC DC Convertor 4...Spares for PA power supply = IRF BUZ 36 (02 nos), SCR SS 5228 (02 nos)
26/03/2012 14:08:23
 
5
BEL 2X50 W 1...Battery bank (2.2v/2500AH) 2...Control unit = Control board 3...Exciter = VSB mod board ,IF & aural mod board,syntesizer.
26/03/2012 14:15:35
 
6
Acute shortage of staff in ministerial cadre.Deployment of staff against vacant posts in ministerial cadre is required at the earliest.
26/03/2012 16:14:19
DMC AZAMGARH
1
Construcion of Terrace and wire fencing of Transformer of UPSEB at LPT Azamgarh
27/01/2012 14:22:27
 
2
Renovation of boundary wall of LPT Dudhinagar.Requirment of local oscillator of ch#10 and 50watt(GCEL) PA.
27/01/2012 14:40:25
 
3
Construction of Boundary wall at LPT sikandar pur. It is damage by animals.
27/01/2012 14:55:22
 
4
Roof treatment of LPT Obra due to very old buildings.Requirment of UMIL transister 100 round base and 100A squar base (10no)
27/01/2012 15:04:55
 
5
Whitewash and painting for differents LPTs under of DMC Azamgarh
27/01/2012 15:11:16
 
6
Requirment of channel converter & AC/DC converter for LPT- Mohammadabad& Rasra
27/01/2012 15:14:15
 
7
Requirment at LPT Rasra (1. Guy wire Estiender Scorup-15 Piece. 2. Bull doke-60 Piece 3.Mast lighte-1no. 4.Earthing.)
27/01/2012 15:28:08
 
8
Part of the building of LPT- Deoria has collapsed. Construction of new building is required
27/01/2012 15:32:14
 
9
Reparing of LPT- Rasra building
27/01/2012 15:33:55
 
10
Water problem at LPT-rasra-deep water level(Submersible is required)
27/01/2012 15:37:32
 
11
Replacement of 10KVA D/G Set at LPT-Rasra,obra.& Ballia
27/01/2012 15:39:51
 
12
Staff requirement AE,SEA,EA.SrTech.
27/01/2012 15:41:44
DMC BALRAMPUR
1
Technical:- 1. PA unit of LPT Bahraich was sent to BEL on 04-01 2008 for repairing .The same has been returned back un- repaired after 4 years in Feb 2012. Now the decision for further line of action may kindly be communicated. 2. The PA unit of LPT Basti was sent to Zonal workshop in Dec.2009 with all spare.The unit is still under repair at Zonal workshop. 3.LPT Gonda , The installation of auto remote WEBEL XTR was completed on 25-02-2010.After that both SMPS 30V/100A became faulty, Exciter-1,Station controll unit , PA-! half portion, Thru Line Watt meter became faulty during gurranty/warranty period. The request was made several time but no WEBEL team visited at LPT Gonda sofar.
25/01/2012 09:55:02
 
2
Budget/Funds:-The budget allocated to this DMC is insufficient to run this DMC smoothly .Hence it is requested to enhence the allocated budget of this Dmc.particularly in DTE & O/E.
25/01/2012 09:56:31
 
3
Staff Position:- There is acute shortage Technical staff at almost all LPTs. Hence technical works suffers alot and it becomes difficult to manage the shift at the station.
25/01/2012 09:56:56
 
4
Vehicle:- The vehical of this DMC is 14 years old and it becomes faulty oftenly. We have to visit 7nos.of LPTs which are aproximately 100km away from each other.Hence it is requested to provide a new vehicle for this DMC.
25/01/2012 09:57:06
DMC BAREILLY
1
SPMS BEL33V/26V -2Nos. are urgently required for UHF BEL MUV199 DDNews transmitter of LPT Shahjahanpur as two nos power supply were defective & unable to repair.
28/01/2012 15:47:06
 
2
At LPT Pilibhit,500W Webels 1+1 UHF XTR was recently installed & working satisfactory .
28/01/2012 15:49:52
 
3
LCD TV / Monitors/Receiver-4Nos. are required for LPTs .
28/01/2012 15:51:37
DMC BHILWARA
1
Replacement of Transmitter of Bhilwara:-Existing Transmitter BEL MVV 131, VHF 100 W is running since 1984 and lived its usefull life. So it is required to replace this transmitter with new 500 W TV Transmitter. It is also mentioned that 100 feet wire guyeded mast has been replaced with 150 feet self supported mast.
24/01/2012 16:32:47
 
2
Requirement of uncommon components:- Some components which are not available at local market such as Programmed ICs of Webel 500 watt(1+1) auto mode transmitter, Term resistance 50 ohm, 150 watt ( part No. BEL 455510690777B) & Atteunator 0-20 dB( part No. BEL 453910220182B) for BEL MVV 137 TV transmitter. The requirement of critical components are also mentioned in monthly report.
24/01/2012 16:40:35
 
3
Requirement of Fedder cable:- RF fedder cable 1-5/8 inch of LPT Badisadari has become defective due to jumping of monkey on it. It is in temporary repaired condition and having large SWR at distance 25 mt. say 1.11. It is also mentioned that it is not airtight now and may creat problem in humidity atmosphere. So it is required to replace RF fedder cable earliest. Letter for this has been sent you .
24/01/2012 16:52:43
 
4
Requirement of LCD TVs:- 32 inch LCD TVs have been provided to most of DMCs against their on Line requirement. DMC Bhilwara got missed this opportunity due to some technical problem. Now it is requested to provide 4 nos 32 inch LCD/LED TVs for DMC Bhilwara.Separate requirement for TVs has been sent you.
24/01/2012 16:59:33
 
5
New DG set For LPT Badisadari:- 10 kva DG set of July 1998 at LPT Badisadari has run more than 10000 hrs and power cut at Badisadari is frequent and of long duration. It is also mentioned that existing DG set is repaired many times so it is now required to replace DG set with new one.
24/01/2012 17:04:54
 
6
Replacement of DG set of LPT Bansi:- 10 kva DG set of July 1996 at LPT Bansi has run more than 17000 hrs and power availibility at Bansi is less. So it is requested to provide a new DG set for LPT Bansi.
24/01/2012 17:08:03
 
7
Replacement of Mast of LPT Tonk:- It is known that transmitter of LPT Tonk is being replaced with new one. Its 100 feet wire Guyeded mast having rusted sections so it is requested to replace this 100 feet mast with new 150 feet self supported mast with the transmitter.
24/01/2012 17:13:27
 
8
Motor vehicle in DMC:- The office vehicle of DMC Bhilwara is of 1997 model Armada jeep has already run more than 2.95 Lakh KM. It is also served its usefull life (more than 14 year). So it is requested to provide a new motor vehicle for DMC Bhilwara for attending LPTs & VLPTs.
24/01/2012 17:20:02
 
9
Arrears Payment of revised rent of LPT Chittorgarh Building:- Circuit House Chittorgarh has claimed an amount of Rs/- 986660/- (Rupees Nine Lakh Eighty Six Thousand Six Hundred Sixty Only) for making payment of arrears and rent upto 31/3/2012. Now the LPT Chittorgarh premises have been shifted to Fort Chittorgarh and existing premises have been vacated w.e.f. 15.04. 2012. Since the amount granted in RE/FE 2011-12 was too short to make the payment of Rent of the other premises, the Rent of LPT Chittorgarh, LPT Pratapgarh, VLPT Amet and LPT Shahpura remained unpaid. It is therefore, an amount of Rs. 21.50 Lacs may please be granted as SBG for RRT Sub-Head so as to enable this Kendra to clear the backlog and make payment of Rent for the current year. In this regard it is also requested kindly to expeditiously release the administrative approval for the revision of Rent of existing premises of LPT Chittorgarh at Circuit House.
24/01/2012 17:36:32
 
10
Monthly Report:- Some pages of monthly report such as Performance fig of X-tr, Video Freq response & Audio Freq response are being send blank by most of the DMCs including us due to lack of technical knoledge or non availability of measuring instrument, So it is requested to make a suitable training programme specially to cover the mesuring point of transmitter also one suitable candidate from each DMC may call for this type training.
25/01/2012 12:51:05
 
11
Pending work related to 45M self supported mast:- installation work of 45m self supported mast and shifting of transmitting antenna from existing 33m wire guyed mast to 45m self supporting mast has been completed on 01.10.2011 at LPT Bhilwara but following work are still pending related to newly installed 45m self supporting mast at LPT Bhilwara. 1. Installation of Lightning Arrester. 2. Earthing for mast. So it is requested that above pending works related to Mast may please be got completed at early as possible
25/01/2012 12:58:53
 
12
In the SBG for the year 2012-13 an amount of Rs. 1,01,000/- has been granted for O&M of Motor Vehicles, which is too meagre amount to meet the requirements. In this regard it may be mentioned that since the premises of LPT Chittorgarh have been shifted to Fort Chittorgarh, as such a Texi Vehicle has been hired on monthly basis for pick-up drop of the Shift Duty Staff, for which an amount of Rs. 18,000/- plus applicable Service Tax per month is to be paid. As such an amount of Rs. 4.50 Lacs is required to meet the requirements of Motor Vehicle both for LPT Chittorgarh and for DMC, Bhilwara Office Vehicle.
03/05/2012 10:14:19
DMC BIKANER
1
1. Shortage of Ministrial Staff :- No staff has so far been sanctioned for DMC in the Ministerial Cadre. One post of Accountant, One post of CG – I, Two post of CG – II have been shifted under redeployment from DDK, Jaipur. Total review of ministrial strength at DDMC is required. DDMC is to be compared with AIR type II studio.
27/01/2012 14:53:53
 
2
2. Requirement of Steno :- Many DMC’s like Pilani, Sri Ganganagar, Bhilwara, Udaipur etc. have been provided with the post of Stenographer. DMC, Bikaner has not been provided with the post of Stenographer since the inception of office. DD, Dte., NSD & AIR, Jaipur have been requested several times to shift One post of Stenographer from major establishments of Rajasthan i.e. DDK, Jaipur / AIR, Jaipur / AIR, Suratgarh or any other establishments where sufficient nos. of Stenographers are posted. At DMC’s it is the functional requirement of Engineering Head to frequently call and correspond with higher offices, LPT’s as well as various State Authorities while working at H.Q. or on tour. Each DMC is supposed to maintain 70 to 80 CR dossiers per year for which the functional necessity for the post of Stenographer is justified. It is requested to shift One post of Stenographer with official for DMC, Bikaner at the earliest.
27/01/2012 14:54:49
 
3
3. Vacant post of Driver :- The post of Driver for DMC was sanctioned, vide MIB Order No. 505 / 17 / 96 -TV(A) dated 10.09.1997. Permission for filling up the post of Driver has not been granted by DD,Dte & the vacancy could also not be filled on transfer basis. Temporary arrangements have been made by engaging drivers through contract which not only increases financial burden on Office Expenses /Motor Vehicle but also causes lot of hinderance in office working due to frequent changes and reluctant attitude of casual drivers. It is proposed to fill up the vacant post of Driver through transfer or permission may kindly, be given to fill the post through direct recruitment.
27/01/2012 14:55:25
 
4
4. Rates of Scroller :- Scroller machines have been provided at LPT’s for running scrolls during “Non-sponsored” telecast. It is obligatory on the part of Delhi Doordarshan Kendra & Jaipur Doordarshan Kendra to facilitate a copy of fixed point chart in advance for determination of sponsored category programme. It has also been observed that tariff rates of scrolls have been broadly decided on the basis of location & Category of classified city of DMC but most of the associated LPT’s are located in the unclassified cities/rural areas where industrial establishment/commercial market are not available but the rate of Scroll has been fixed as same as that of DMC’s. It has been proposed several times to DDG (Commercial) to reduce the rate of Scroll at LPT Nokha, Sardarshahar, Sridungargarh, Ratangarh, Sikar, and Sujangarh from Rs. 300/- to Rs. 150/- per day and also to withdraw condition of deposits through Demand Draft. It is also proposed to award 20% Commission/honorarium to the staff engaged in revenue generation in addition to their assigned duty hours & works.
27/01/2012 14:57:18
 
5
5. Cable Television Network Ordinance 1995 :- Implementation of cable T.V. Act 1995 by enforcing cable operators to carry DD-1 & DD-News in prime band and other five stipulated DD channels in non-prime band is the responsibility of DD Heads. It is very difficult for Engineering Head to ascertain no. of cable operator actually registered with Post Office, as actual operator are different from the registered ones at Post Office. It is proposed to carry out suitable amendment in Cable T.V. Act to make mandatory provision for registration of operators at Doordarshan Offices DDK/HPTs/DMCs/LPTs etc. Power to initiate legal action against default Cable operator should be vested with Heads of Engineering establishments. Monitoring charges should also be provided to AEs of LPTs.
27/01/2012 14:58:16
 
6
6. Provision of Borewell:- To get rid off scarcity of water, Tube well (Motorized) is proposed under “PRG”. For LPT Ratangarh, LPT Nokha, LPT Sridungargarh, LPT Sujangarh & LPT Khajuwala under DMC Bikaner.
27/01/2012 14:59:05
 
7
7. Replacement of Guyed Mast:- LPT Sridungargarh:- Due to constraint of space 45 Mtr. Guyed Mast could not be erected to desired height. The Guys & Guy Anchors could also not be installed properly due to lack of space. It is proposed to replace 36 Mtr. Guyed Mast with 45 Mtr. S.S. Mast for improving coverage area and safety aspects LPT Sujangarh:- It has been observed that Guy wires and Guy Anchors have been installed beyond rented premises of LPT. Lot of space around 10,000 Sq. feet may be saved and rent could be made reasonable by installing 45 Mtr. S.S Mast.
27/01/2012 15:00:16
 
8
8. Vacancy of Technical staff at LPTs’ under DMC Bikaner:- LPT Sridungergarh:- One post each in the cadre of E.A. & Sr. Technician are lying vacant the same are proposed to be filled through transfer. LPT Nokha :- Only Five Posts have been sanctioned keeping in view single Transmission but all three transmission are being carried for past many years. One post of SEA may be diverted from elsewhere. One post each of Technician lying vacant may be filled through transfer. LPT Ratangarh :- Two post of E.A are lying vacant. The same may please be filled up through transfer. LPT Sujangarh:- Only One sanctioned post of S.E.A. had been shifted to LPT Nanidanda vide order No 2/4/DDM/ADM/TP-2003 dt. 17.10.03 of CE (NZ), the same may please be reverted back. LPT Khajuwala:- One post of Tech. are lying vacant. The same may please be filled up through transfer.
27/01/2012 15:01:07
 
9
9. Inherent problems 500W(1+1) Transmitter at LPT Khajuwala:- 1. (1+1) (500 Watt) Auto Transmitter supplied by BEL is having inherent problems since commissioning & needs improvement. The coverage area of 500W VHF transmitter with 60 Mtr. S.S. Mast is very less. This may kindly be attended on top priority. 2. The remote monitoring system is not working. BEL has demanded exorbitant prices to attend the fault. 3. The spare i.e. PA, Pallets, etc. have not been provided. 4. Two Nos repaired Power amplifier received from BEL in the month of March 09 are not working in the circuit beside this other. PA of other Transmitter are also defective as a result of this Transmitter is being operated at low power.
27/01/2012 15:01:51
 
10
10. Pending Audit Paras:- 24 Nos., 2V/800AH old batteries were supplied by Zonal Office in the year 2005 as replacement of old batteries. This consignment was found damaged during transportation from D-6 to DMC, Bikaner. As all these 24Nos. batteries got damaged in transportation, so may be declared as “condemned” by Zonal Office at the earliest. 2.Outstanding imprest against Sh. S.K. Jha, former Station Engineer , DMC Bikaner:- The cash imprest vouchers (9 vouchers) amounting Rs. 2632/- were lying pending with sh. S.K. Jha from 1999. Due to non availability and proper verification in records Sh A.K. Bajaj ,Station Engineer denied the recoupment of imprest vouchers to Sh. S.K. Jha in the year 1999-2000. Audit team of AG in the year 07-08 & 08-09 has made paras for recovery of Rs. 6,659/- from sh. S.K.Jha. This amount has not been paid to DMC Bikaner despite several request to DD , Dte.
27/01/2012 15:02:29
DMC DHARAMSHALA
1
RF Transistors TPV-6030 for 07nos. defective Power Amplifiers.
19/01/2012 15:29:31
 
2
SMF VRLA battery bank-For VLPT AwahDevi (2475Ah,24V), Ashapuri & Palampur (1600Ah,24V)
19/01/2012 15:32:31
 
3
RF lightening arrestor- 03nos. each for all six VLPTs (Palampur, Baijnath, AhjuFort, Ashapuri, Kot & AwahDevi)
19/01/2012 15:36:13
 
4
Chemical Earthing at all VLPTS (Palampur,Baijnath,AhjuFort, Ashapuri,Kot & AwahDevi)
19/01/2012 15:43:23
 
5
Condition of VLPT Kot building is not satisfactory (Plaster is comming down in pieces from rooftop and steel can be seen through naked eyes) In this rain, water leaked inside the building.
19/01/2012 15:55:31
 
6
Post of 03 no. of EAs are to be filled on priority (02 nos. at LPTV Sujanpur &01 no. at DMC) as these post are lying vacant.
23/01/2012 10:35:02
 
7
Construction of rooms for DMC Dharamshala office above the existing building of Doordarshan HPT City Office to save the manpower and rent.
13/02/2012 11:46:24
 
8
Sanction orders for unserviceable/obsolete store items of DDMC Dharamshala.
03/05/2012 12:16:15
DMC ETAH
1
LAPTOP FOR HEAD OF OFFICE
27/01/2012 14:12:35
 
2
DESKTOP FOR ALL LPTS LIKE LPT ETAH, KASGANJ,GANJDUNDWARA, MAINPURI, FATEHGARH, CHHIBRAMAU, NARORA
27/01/2012 14:14:37
 
3
UPS 6 KVA REQUIRED FOR TRANSMITTER AT LPT FATEHGARH AND NARORA
27/01/2012 14:18:10
 
4
WINDOW AC 1.5 TON REQUIRED FOR LPT ETAH, FATEHGARH & NARORA
27/01/2012 14:20:34
 
5
TRANSISTER BUX 48, 2SC 29230 URGENTLY REQUIRED
27/01/2012 14:21:52
 
6
400 MHz CRO REQUIRED
27/01/2012 14:22:47
 
7
SITE MASTER URGENTLY REQUIRED AND DEMANDING SINCE LAST TWO YEARS BY THIS KENDRA
27/01/2012 14:23:51
 
8
10 NOS POWER TRASISTER TPV 3100/VTV 100 URGENTLY REQUIRED FOR SMOOTH TRANSMISSION
27/01/2012 14:28:13
 
9
RO REQUIRED FOR DMC ETAH , AND ITS TDS -1560 . LPT NARORA AND ITS TDS -560
27/01/2012 14:29:08
 
10
ACUTE SHORTAGE OF STAFF AT LPT ETAH ONLY AE/ EA POSTED
27/01/2012 14:31:04
 
11
BUDGET COMPLETELY EXHAUSTED IN RRT SUB HEAD, ARMS GURAD
27/01/2012 14:32:22
 
12
CONSTRUCTION OF SECURITY WALL AT LPT MAINPURI AS TO PREVENT FROM UNWANTED ELEMENTS INTRUDED TIME TO TIME
27/01/2012 14:34:27
DMC FAIZABAD
1
Recently two Webel make 500 W (1+1) Transmitters have been commissioned at LPT Lalgaj and Jagdishpur. The performence of these Transmitters are very poor. Presently most of the problems has been rectified.
25/01/2012 13:31:03
DMC HANUMANGARH
1
Vacant Post under various cadre:- The following posts are lying vacant in different cadre:- 1. AE- vacant 5 Nos out of 6. LPT Nohar, Bhadra Mandi Dabwali Rawatsar & Hanumangarh. 2. SEA- vacant 1 No LPT Bhadra. 3. EA- vacant 11 Nos. DMC 1 No, LPT Hanumangarh 2 No., LPT Sirsa 2 Nos, LPT Bhadra 1 Nos, LPT Nohar 2 Nos, LPT Rawatsar 2 Nos, LPT Mandi Dabwali 1 No.4. Sr. Tech.- vacant 2 No. LPT Bhadra & LPT M. Dabwali. 5. Technician- vacant 1 No LPT Bhadra.6. Helper vacant 5 Nos. LPT Hanumangarh 2 Nos, LPT Sirsa 2 Nos, LPT Mandi Dabwali 1 No.7. Security Guards- vacant 2 Nos. LPT Hanumangarh 1 No., LPT Sirsa 1 No. The above posts may kindly be filled up.
30/01/2012 13:26:43
 
2
Post of Assistant Engineer at LPT Rawatsar:- The Post of Assistant Engineer was diverted to DDK Hisar from LPT Rawatsar vide DG order no- 5/8/2003 dated 17/07/2003, which may kindly be restore at the LPT Rawatsar
30/01/2012 13:28:00
 
3
Construction of Boundary Wall of LPT Hanumangarh:- The Boundary Wall of LPT Hanumangarh has collepse due to heavy strome. Now there is no security fencing is available at front side. You are therefore requested to construct new boundary wall. The estimate received from CCW Jaipur along with W- Form has already sent to you vide this office letter no. HMH/2(4)(4)/2010-E dated 22-07-2010
30/01/2012 13:28:45
DMC HARIDWAR
1
Our All the LPTs except Hardwar are working in a rented building. Since commissioning no maintenance of these building is being done, neither by state govt nor by our Deptt. As on date the condition of building of LPT Dakpathar, Kotdwar and Kalagarg is very poor and risky.
25/03/2012 13:54:43
 
2
The Tower painting of all the VLPTs and LPTs is required to be done.
25/03/2012 14:22:53
DMC HISSAR
1
Construction of PORTA CABIN is required after earth filling upto height of road level ( 3ft approx. ) at LPT BHIWANI
16/05/2012 15:36:28
 
2
The boundry wall of LPT BHIWANI is to be raised upto 3 ft. height & angle iron barbed wire fencing surrounding the premises and replacement of main gate are required for security of Kendra
16/05/2012 15:44:12
 
3
03 Nos window AC 1.5T for LPT BHIWANI & 02 Nos window AC for LPT Charkhi Dadri are required
16/05/2012 15:46:50
 
4
02 Nos IRD for LPT BHIWANI & 01 for LPT MEHAM are required
16/05/2012 15:59:38
 
5
02 Nos 28V/50A SMPS Power Supply are required for LPT Bhiwani
16/05/2012 16:02:19
 
6
02 Nos TV/LCD are required for LPT BHIWANI for monitoring purpose
16/05/2012 16:05:37
 
7
Shifting of LPT Rohtak from old building to New FM building in AIR campus Rohtak required immediately
16/05/2012 16:40:11
DMC JAMMU (NORTH)
1
New Maintenance free batteries for all VLPTs may be provided as the existing batteries have served their useful life. At present only one set of battery bank at each VLPT is in working condition. The requirement is an urgent nature.
25/01/2012 12:45:28
 
2
20 Nos. Exide-Power safe sealed lead acid batteries EP-26-12W-12 Volt-26AH for 6KVA-UPS at LPT, Reasi have served useful life and needs replacement.
25/01/2012 12:50:17
 
3
The following equiptments for 50W BEL/WEBEL Transmitters may kindly be provided: BEL(VHF) Power Amplifire and Exiter, CH#5 -2Nos each.DC-AC Convertor -2Nos. WEBEL(UHF)Power Amplifire and Exiter CH#25 & 34 - O1No. each. DC-Dc Power Supply for PA- 2 No.
25/01/2012 12:56:34
 
4
The following transisters/modules may kindly be provided for the repair of BEL/WEBEL 50 Watt Transmitter. TR.PTB 20101, UTV-200, BLW 32,33 & 98, TIP-127&BD135-10Nos each. PA Control Board Part No.114002301814, Linearity Corrector Board Part No. 114002298128, IF and Aural Modulator Board Part No. 114002289107, UP Convertor Part No. 114002394837-2 No. each.
25/01/2012 13:03:52
 
5
Professional Satellite Receivers for LPT, Reasi- 2 Nos.
25/01/2012 13:04:46
 
6
Up-gradation of 2X10W GCEL VLPT-Ardhkuwari, as the X-mitter has served its useful lie. Since the VLPT is situated at a quite far distance from the base camp, Katra. Moreover it was brought to your kind notice earlier that the Monkeys made havoc at the VLPT, they have broken the glass windows of XTR-Room and damaging the equiptments, Dish & other things regularly. In this regard an alaternative place may kinldy provided so that the diffculties we face for maintaining the VLPT can be avoided.
25/01/2012 13:20:05
DMC JAMMU (SOUTH)
1
84 Batteries are requuired for 7 VLPTs namely VLPT Banihal, Batote, Kud, Ramban, Sanasar, Manwal. & Jajjerkotli (12 batteries for each VLPT), as the existing batteries have served their useful life and fresh batteries are required for smooth running of VLPTs
30/01/2012 15:00:32
 
2
Additional TVRO 24 Volt Whisplus may be provided for VLPT’s
30/01/2012 15:02:36
 
3
VLPT Sanasar The retaining walls of the fencing needs to be repaired and concrete path way from the main gate to Portacabin is to be laid. Also painting and minor repairs of the security fencing and porta cabin is required
30/01/2012 15:06:09
 
4
In order to avoid damages to the solar pannels due to heavy snow fall at VLPT Batote the height of the existing solar pannels is to be raised to for smooth functioning of transmitter. more over fencing is broken and needs augumentation of fencing.
30/01/2012 15:07:06
 
5
MLPT Patnitop a) Spares for BEL 2 x 250 watt Mobile transmitters are not available b) The PA CONTROL Board, PA pallet Assembly, Driver pallet Assembly are not available or a spare Power Amplifier of 250 W may be provided.
30/01/2012 15:08:42
 
6
The dish of regional service at VLPT:Kud has been damaged due to heavy snowfall. One new dish is required to be installed at VLPT:Kud.
08/05/2012 17:48:16
 
7
1. VSB Modulator Part No.114002289980 for VLPT:Kud is required.
08/05/2012 17:50:22
DMC JHANSI
1
Linear power supplies at LPT Karwi, Rath, Mahoba, Lalitpur and Mauranipur fails frequently . SMPS 28V/25A , 02 nos. each are required for above LPTs.
24/01/2012 16:16:19
 
2
GCEL Make 121 -3 Transmitters ch#5 at LPT Talbehat does not have Divider Combiner unit in spare. Its failure make cause breakdown. A Divider Combiner unit may be provided. An audio/Video swicther also required at LPT Talbehat
24/01/2012 16:21:53
 
3
GCEL make 121-1 ch# 10 transmitter was installed at LPT Lalitpur in the year 1987.The transmitter become very old and create trouble time to time. Its replacement is required. Following modules also required for LPT Lalitpur 1)Spare Diver Amplifier for GCEL 121(1)ch#10 2 )Aural Modulator for CGEL exciter. 3) 50 w spare PA GCEL make.
24/01/2012 16:25:05
 
4
2 no. PA at LPT Mauranipur become unservicelbe 2 no of GECL make 50 w PA is required. combiner module also required for Transmitter model GCEL 121-1
24/01/2012 16:27:42
 
5
GCEL make 121-3 ch #8 Transmitter at LPT Krawi required 10 w driver amplifier in spare. The failure of only unit can result in a breakdown.
24/01/2012 16:30:09
 
6
AC to DC converter for GCEL make exciter at LPT Mahoba is required. Transmitter model 121-1
24/01/2012 16:31:14
 
7
Channel converter for ch# 10 for GCEL make II exciter at LPT Jhansi is required.
24/01/2012 16:32:53
 
8
Regional Switching unit is not available at VLPT Manikpur.A unit may provided with spares so that VLPT may relay regional Programmes.
24/01/2012 16:36:57
 
9
10 nos of LCD monitors for 09 LPTs & 01 DMC is required as existing monitors becomes very old and create problems most of the times.
24/01/2012 16:41:36
 
10
09 nos of computers required for 09 LPTs for faster working.
24/01/2012 16:43:40
 
11
Diesel Generator set HA 294 10 KVA was installed in LPT Lalitpur in the year 1987. It is creating problems frequently & required to be replaced
25/01/2012 15:26:06
 
12
Mast painting is required at Jhansi ,Lalitpur
27/01/2012 13:19:14
DMC JODHPUR
1
Station Control Unit and 6 KVA on line UPS of UHF (1+1) 500 w Transmitter at LPT, Pali are not working properly since beginning. These Units have been repaired earlier also. Station Control Unit Make & Model No. Webel, SCU 500-11-V2 Serial No. 97580049. 6 KVA on line UPS Make & Model No. Emerson Network Power Sr. No. 0805 AS0939.
09/02/2012 12:15:25
 
2
Requirement of Equipments/ Items:- 10 Nos. 1.5 Ton Air conditioners, 16 Nos. IRDs, 10 Nos TV receivers & 12 Nos LCDs are required for LPTs, as old monitors & TV receivers are giving frequent Problem. These have served useful life. Replacement of these Equipments/ Items are required for proper working.
09/02/2012 12:25:01
 
3
Shortage of Technical staff at LPTs :- acute shortage of staff in various cadre at all LPTs under DMC Jodhpur.
09/02/2012 12:26:00
 
4
Vacant post of Driver :- The Driver of DMC has been retired on June,2007. SD, AIR, Jaipur and DG:DD are being requested to fill the post on transfer basis. It causes lot of hindrance in office work.
09/02/2012 12:26:48
 
5
One post of CG – II has been lying vacant for years. SD, AIR, Jaipur and DG:DD are being requested to fill the post on transfer for timely disposal of Accounts, Administrations, Stores, RTI & Budgetary requirements work.
09/02/2012 12:27:46
 
6
Requirement of Steno :- Many DMC’s have been provided with the post of Stenographer. DMC, Jodhpur has not been provided with the post of Stenographer since beginning .It is requested to shift One post of Stenographer from major establishments of Rajasthan.
09/02/2012 12:28:33
 
7
Acute Budgetary constraints under Sub-heads Salary ( Irla), OE, MV, MW, DTE ,METP,OAE and Armed Guard.
09/02/2012 12:30:54
 
8
At nagaur Lpt ,the following items are defective,Exciter-2nos,Control unit-2nos,One control logic card,and one computer and one ups-800va,since last two years.
10/02/2012 13:20:05
DMC KANPUR
1
Shortage of staff at DMC & attached LPTs, Not timely repairing of equipments by CE(NZ), Sanction of increased building rent of LPT, Etawah & spares of DG sets & batteries for 10KVA U.P.S. for LPT, Tirwa & Lalganj
01/03/2012 15:20:45
DMC KARGIL
1
a.Requirement of New office vehicle. We have only 0ne no. office vehicle which already running more than 1 lakh km. For maintenance of forside VLPTs new office vehicle must be required. b.There is no any admistrative staff in DMC so we face alot of problems .Kindly posted atleast 2 no. of admn staff.
25/01/2012 15:04:52
 
2
a. 25 KVA Generator is needed b. professional IRDs (SCOPUS) at least 3.No. needed c. Batteries for 6KVA UPS (12 V 25Ah) are needed 20 Nos. d. Spare PDA 6.2 mtr is needed. e. Construcation of boundery wall of land reserved for future expansion of Doordarshan to avoid encrochment from local people. f.Needed of new staff quarters and maintenance of existing staff quarters.
25/01/2012 15:25:16
 
3
a. Requirement of 11Sets battery banks (2 bank of 24 volts) at VLPTs Sankoo,padum,Bothkharboo,Mulback,panikhar,Rangdum,Abran,Zangla,Ichar. b. Constraction of some portion of already fallen boundary wall at VLPTs Padum and VLPTs Drass. c. Requirtment of PDAs 2 No. in VLPT Padum and Drass.
25/01/2012 15:34:36
 
4
REGARDIND FUND AVAILABILITY 1. The fund required under head METP,RRT,MINOR WORK & MV . There is fund needed for doing rouitene maintence work in VLPTs/LPT.
31/01/2012 21:54:22
 
5
STAFF STRENGTH AGAINST DMC/LPT: Absolutely no administrative staff posted.Obviously due non-avaibility of them the technical staff has to do all administrative work as well.This result in technical outputs.The staff posted in LPT/VLPTs is 1 SEA, 3 Tech,1 helper &only one SG.
15/02/2012 15:12:28
 
6
AVAILABILITY OF EQUIPMENTS: 10W SYSTEM: As we noticed most of these exciters have gone defective, quite often the modulator cards are the culprit. the battery bank become useless so VLPTs are not in working position.it is proposed that the Ku band system may be provided against each installation as the are most effective during the snow fall.
15/02/2012 15:27:32
 
7
REQUIREMENT OF THE INSTRUMENTS. 1.Multi range thru line watt meter 2. 400 MHZ CRO (Preferably hand held) 3. WFM (Hand held only LPT KARGIL) 4. Technical drawing for 500 W PA. 5. Spare 500 W PA. 6. Spare 100 W PA.
15/02/2012 15:34:01
 
8
OTHER WORKS REQUIRED DMC/LPT COMPLEX. 1. Electrical wiring is in poor condition so new wiring is needed in whole complex. 2. New 25 KVA DG set are required. 3. Ac is to be installed in LPT.
15/02/2012 15:42:30
DMC KARNAL
1
Shortage of staff at subordinate level: There is acute shortage of staff at all the LPTs under this DMC. We are finding it very difficult to manage even the leave/ weekly off etc. to the staff at LPTs even by deputing single person in shifts.At least some staff may be posted at all the LPTs under this DMC for smooth running of the transmitters.
26/01/2012 15:31:59
 
2
Window AC: Five number of window AC are required for different LPTs under DMC Karnal as existing 05 Nos of ACs (1.5 ton Capacity) in XTR Halls of different LPTs under DMC karnal were installed at the time of installation and have served their useful life .It is requested that Five (split / Window) ACs 1.5 tonne may please be provided to the station.
26/01/2012 15:33:01
 
3
At LPT Yamuna Nagar: SMPS 28V/50Amp- Two nos SMPS supply are required at the station as one of the supplies is beyond repairs and spare supply has also served its useful life. It is requested that two nos SMPS 28V/50Amp may be provided to the Station
26/01/2012 15:33:36
 
4
At LPT Ambala: Two Nos FEC Board of Scopus IRD are required as the FEC Board in Scopus receiver are faulty & are beyond repairs.It is requested to provide two Nos of FEC Board of Scopus IRD.
26/01/2012 15:34:08
 
5
LCD 14”- Eight Nos LCD are required for different LPTs under DMC Karnal as existing monitors at the station are faulty and are beyond repairs/ have served their useful life since installation.. It is requested that for monitoring program quality Eight nos of LCD 14” may be provided
26/01/2012 15:34:44
 
6
IRD Scopus: 12 Nos spare IRDs are required for different LPTs under DMC Karnal for down linking national /regional service for respective transmissions from these LPTs.
26/01/2012 15:35:08
 
7
TV Receiver: Five Nos TV receiver 53cm at different LPTs under DMC Karnal have served their useful life and requires replacement. New 53cm. receiver /32 inch LCD Five in number may please be provided to these stations for monitoring of air quality .
26/01/2012 15:35:44
 
8
CCW: •The work related to the roof treatment, External finishing, Rain water pipes etc. of LPT Ambala could not be carried out last year even though the estimate submitted by CCW were forwarded and approval granted by the Zonal office but the funds were not transferred to CCW by the Zonal oofice. It is requested that the same work may be done by office of CE (NZ) .
26/01/2012 15:38:56
 
9
Porta Cabin at LPT Kurukshetra : Interior finishing(Paint and repair work) of porta cabin at LPT Kuruk shetra is due and has been projected under Aug.& Rep MW 2010-11.Approx expenditure for the work projected by A.E Kurukshetra amounts to Rs 35,000/-.It is requested that this work may be done by office of Chief Engineer (NZ) under PRG or some other scheme.
26/01/2012 15:39:53
 
10
Overhauling of the HA 294, 15 KVA Kirloskar engine DG Set of LPT Yamunanagar is urgently required. A new Generator or the neccessary spares for the generator may please be provided.
26/01/2012 21:48:58
 
11
One photocopier and one computor is urgently is required for DMC Karnal office .
27/01/2012 13:09:24
 
12
computors may be provided for the LPTs under the dMC.
27/01/2012 13:10:58
 
13
Battery bank for UPS of LPT Yaqmunanagar is required .
17/05/2012 15:59:11
DMC KATHUA
1
FOR VLPT Gujroo Nagrota / Ramkot / Billawar / Basohli / Bani / Hira Nagar 1. Fencing Work :- The condition of fancing of all the VLPts are in very bad condition and urgently needs welding/Masson work.
23/03/2012 11:22:50
 
2
FOR VLPT Gujroo Nagrota / Ramkot / Billawar / Basohli / Bani / Hira Nagar 2. Painting Work :- Painting of all VLPTs Fencing/ Gate/ Tower/ Dish are urgently required.
23/03/2012 11:24:34
 
3
For VLPT / Ramkot / Billawar / Basohli / Bani / Hira Nagar 3. POTA CABIN Shielding :- The roof of the POTA CABIN is licking during the Rain caused damaging / effecting XTR as well as related equipments. To avoiding this urgently required Fiber sheet to cover the POTA CABIN.
23/03/2012 11:29:16
 
4
For VLPT Gujroo Nagrota / Ramkot / Billawar / Basohli / Bani / Hira Nagar 4. Security lights :- There is no arrangement for the security lights in all the VLPTs. Facing threat of thefts for stolen solar panels. Ex , 27 nos solar panels were stolen from the VLPT Gujroo Nagrota./ VLPT Baohli. To avoiding this security lights are very much essential for all VLPTs at least 03 nos each for all VLPTs. Total 18 nos are required .
23/03/2012 11:30:55
 
5
For VLPT Basohli 5. Link Road :- There is no link road for reaching VLPT Basohli. The VLPT installed on the top of the hill, and we have bound to park the vehicle ½ kilometer before the VLPT.
23/03/2012 11:32:25
 
6
For VLPT Gujroo Nagrota / Ramkot / Billawar / Basohli / Bani / Hira Nagar 6. Professional Receivers :- 10 nos WIS PLUS receivers are urgently required for VLPTs. Sharp Vision receivers are not performing well because O/P Audio of sharp Vision is very low.
23/03/2012 11:35:22
 
7
7. Motor Vehicle:- The SBG under Motor Vehicles is Rs. 77000/-. The expenditure upto Dec’11 is Rs.68,700/-. Rs 35000/- Petrol bills are pending The balance is not sufficient for remaining 3 months. The average distance of VLPTs from DMC is 85 Kms. If 2 trips per VLPT per month are made, the Petrol required is 204 liters per month. For one year the Amount is Rs. 1.3 lakhs. Due to bad road condition the maintenance vehicle cost Rs.30,000( as per last 2 years expenditure). Therefore, a bare minimum of Rs. 1.6 lakhs per year is required. Anything less than this would amount to cut in the trips and may affect the proper maintenance of VLPTs. A detailed requirement has been sent to Budget section of DG:DD. This requires recommendation of Zonal office to get the funds.
23/03/2012 11:36:45
 
8
8. Equipments for VLPT Exciter unit (GCEL) for Ch-06 and Ch-08 are required for VLPT Hiranagar/ Ramkot and Bilawar 10W PA for VLPT Hiranagar and Bilawar as no spare is available for repairing of these units.
23/03/2012 11:38:06
 
9
1. LPT, 300UHF/ GCEL 04 nos PA Band IV/V Ch-24 needs , 02 no defective. 28V,50Amp SMPS supply required. 01 no P/s defective.
23/03/2012 12:19:54
DMC KOTA
1
DMC KOTA- Acute Budgetary constraints under Sub-heads Salary (Non Irla), OE, MV, MW and Armed Guard.
31/01/2012 13:56:32
 
2
DMC KOTA -Acute shortage of ministerial staff: - Only one UDC is presently working at DMC Kota, one post of accountant and one post of LDC lying vacant.
31/01/2012 13:57:18
 
3
DMC KOTA- One no. DC to DC converter for GCEL Exciter of each VLPT at Rawatbhata and Gangdhar. Battery Bank at VLPT Gangdhar has become totally defunct.Replacement of the same may be provided on priority.
31/01/2012 13:58:17
 
4
LPT SAWAIMADHOPUR (BEL MVV 131 , Ch#8 with offset -10KHz. )- Following Exciter spares are required:- 1. 12V/1Amp.DC power supply. 2. 16V/4Amp DC power supply 3. 24V /4Amp DC power supply.4. One number of 2 ton Split AC may also be provided.
31/01/2012 13:59:11
 
5
LPT JHALAWAR(WML(1+1), Ch# 21 )- 1. Following sparer required for LPT Jhalawar (i) Power amplifier- 1 no. (ii) 28 V/50 A DC Power supply make Powertek- 1 no. (iii) 12 V AC to DC convetor for exicter- 1 no. (iv) 2 ton split AC-1 no.
31/01/2012 13:59:35
 
6
LPT PIRAWA(BEL MVV 137, Ch# 8 ) 1. Following spare are required for LPTV; (i) 40 watt Power Amp. -1 no. (ii) 28V/1 A DC Power Supply – 1 no. (iii) 28 V/10 A DC Power Supply – 1 no. (iv) 2 Ton split AC – 3 nos. as old window ACs are giving frequent trouble. 2. Painting of SS Mast.
31/01/2012 14:00:40
 
7
LPT GANGAPUR CITY (WML –LDU-2x300 w upgraded by WEBEL, CH#21 )1. Following spare are required for XTR (i) Power Amp. 1 no. (ii) AC to DC convertor for exciter – 1no. (iii) 2 Ton Split AC – 1 no. 2. Providing SS mast in place of guyed wire mast.
31/01/2012 14:02:28
 
8
LPT BARAN(, WML –LDU-2x300 w upgraded by WEBEL, CH#23)- 1. Following spares are required for LPTV , Baran (i) Power Amp. -1 no. (ii) 2 Ton split AC – 3 nos. as old window ACs are giving frequent trouble 2. The Antenna field of LPT Baran has become a virtual swimming pool for tadpoles because of heavy seepage from near by Nallah resulting into unhealthy surroundings and abundances of mosquitoes. The field level needs to be raised substantially on priority basis. 3.Providing SS mast in place of guyed wire mast.
31/01/2012 14:02:55
DMC KUPWARA
1
1.Budget .In adequate funds are provided in various heads viz, OE & OTA for maintaining and smooth functioning of DMC (Kupwara) . 2.spares for GCEL 50watt transmitter. a) PA Monitor board . b) Video input module. c) IF converter. d) Upconverter. e) synthesizer. f) IF carrier generator . g) Aurul Modulator. h) DCtoDc converter. i) Battery bank 1650Ah for VLPT Machil (Kalaroose) as the present battery bank has already completed its normal life. j) 6Nos of 4.4amp solar plates required for VLPT Machil. 3.spares for GCEL 50watt transmitter. a) PA Monitor board . b) Video input module. c) IF converter. d) Upconverter. e) synthesizer. f) IF carrier generator . g) Aurul Modulator. h) DCtoDc converter. i) Battery bank 1650Ah for VLPT Lolab as the present battery bank has already completed its normal life. j) 40 Nos of 4.4amp solar plates required. PDA Lolab is not installed till date and one number of PDA (ECIL) is lying at VLPT lolab. Presently transmission is run on DTH . So PDA requires installation for VLPT Lolab. 4.Spares for 2*50Watt BEL transmitter. 1.Mosfet BLF 378 2.Mosfet BLF 346 3.Battery bank 1650Ah for VLPT Langate as the present battery bank has already completed its normal life. 4. 4Nos 4.4 Solar plates.
24/01/2012 15:10:46
 
2
1.Spares for 500watt BEL make transmitter. 1. MOSFET BLF378 2. MOSFET BLF346. 3. Generator for MLPT Chowkibal presently two numbers of generator 14KVA Honda make SAWA-Fuji are installed in the Mobile Van . Spares for these generators are not available,even the fillters are not available in the market ,also all these generators have surived their usefull lives. Now ,it is proposed that new generator of 15KVA capacity for MLPT Chowkibal may be provided.
24/01/2012 15:12:13
DMC LEH (NORTH)
1
The following VLPTs are required the battery BAnks. and the existing Battery Banks is exhausted. 1. VLPT Dha, 2. VLPT Temisgam, 3. VLPT Panamik. and also required 50 Nos of solar plates for replacement at VLPTs were the SPVs are damaged/ thefted.
27/01/2012 12:02:31
DMC LEH (SOUTH)
1
The battery bank of the VLPT –Tangtse, Chushul, Nyoma, Demchok are in weak condition. The replacements may be required.
25/01/2012 14:50:09
DMC MANDI
1
Restoration of shifted SEAs post from LPT Mandi & Manali.Headquarters of these postS has been shifted to CPC vide letter no. 2/4/DDM/Admin-2003 Dt 18-08-2003
20/01/2012 16:06:31
 
2
Restoration of shifted post of AE from LPT Manali to DMC Karnal . Headquarter of this post has been shifted to DMC Karnal vide letter no 8/7/2004-SIV/529 dt 05-04-2005.
20/01/2012 16:08:00
 
3
Sanction for filing of the vacant post of Technician at VLPT Keylong.
20/01/2012 16:09:17
 
4
Filling up of vacant posts of the Engineering Assistants and Technicians at different LPTs under the control of this DMC & filling up of vacant posts of Accoutant & two nos of LDCs.
20/01/2012 16:11:19
 
5
Request for the release of advance funds against sanctioned estimates of Rs 313968/- for the counstuction of the retaining wall at LPT Mandi to protect the DG Room & porta cabin stores at VLPT Nihri & Bijlimahadev as being demanded by CCW.
20/01/2012 16:20:03
 
6
Request for the approval/sanction of the estimates amounting to Rs 11,60,000/- ( Estimate already been sent to the Zonal Office ) for fixing chain link fencing for LPT & Staff Quarters land at LPT Mandi (HP).
20/01/2012 16:27:29
 
7
Request for the approval/sanction of the estimates amounting to Rs 5,83,426/- ( Estimate already been sent to the Zonal Office ) for fixing hard drawn steel wire fencing at VLPT Keylong (HP).
20/01/2012 16:31:09
 
8
Request for the approval/sanction of the estimates amounting to Rs 12,53,700/- (Estimate already sent to the Zonal Office ) regarding construction of prefabricated structure for LPT Manali (HP).Land of LPT MANALI is on lease from State Govt. being forest land.LPT has been installed in a forest hut having wooden roofing at low height.condition of hut is not good being very old.It is also not safe from fire hazards also having wooden structure all around.Space being limited ,old xtr.storage problem will also be there on its replacement.Therefore it is requested to cosider the proposal on priority please.
20/01/2012 16:36:21
 
9
Construction of staff quarters at LPT Mandi. The land has been already purchased in the year 2001 .
20/01/2012 16:37:27
 
10
Request for the approval / sanction to engage one Data entry operator on contract basis against the vacant post of LDC.
20/01/2012 16:39:24
 
11
The conditions of the maintenance free batteries at nine VLPTs has become worst and required to be replaced at the earliest . The battereis were installed in the year 2003-04 and has completed the useful life. At VLPT Shivabadar & Chaturbhuja all maintenance free batteries have failed & transmitters are running on A/C supply .
20/01/2012 16:46:06
 
12
Demodulator is required for CH#27 transmitter at LPT Sundernagar. It has not been provided since installation.
20/01/2012 16:47:53
 
13
Requirement of 31 Nos. Solar panels for VLPT Sarkaghat as replacement for the stolen Solar Panels.
23/01/2012 12:08:45
 
14
Following equipment /components are reqd. at different centres: 1.LPT Sundernagar: (A) Wndow Air Conditioner 1.5 Ton with AVR : 03 Nos. as old A/Cs have completed their normal life period & are giving frequent troubles. (B) Spare Power Amplifier 300W UHF CH#27 WEBEL Make. Class AB (C) CTV 14 inches :02 Nos 2. LPT Mandi: (A) TV Demodulator wideband : 01no (B) Wave Form Monitor : 01 no. (C) CTV 14 inches: 02 nos. 3. LPT Manali (A): Earth Tester :01 no. (B) Servo AVR 10KVA : 01 no, old 5KVA AVR is giving frequent troubles. (C) CTV 14 inches: 02 nos 4. LPT Kullu (A):Relay Board PCB 1,2& 3 for SCU bypass unit :As spare. (B) PCB Assembly SCU Control Board-2(PCB-3) :As spare . (C) PCB Assembly RF Switch& PPC (PCB-1) : As spare. (D) PCB Assembly Key Board-II (PCB-2) :As spare. (E) VSB Modulator Card :01 no ,as spare. 5.VLPT Sarkaghat : RF Cable 7/8 inches : 60mtrs, Cable in ckt. has been punctured at two places due to heavy lightning. 6. VLPT Udaipur: Dual Pol.C Band Feed( BEL make) :01 no. 7.VLPT Nihri :PA Control Card& PSU control card for BEL-159,50 Watt,PA : 01nos each. 8. Digital Satellite Receivers, 12Volt DC Operated: 24 Nos(Two nos for each VLPT as spare)
23/01/2012 13:12:07
 
15
DMC Mandi:Following Equipments are reqd. at DMC Mandi for measurements at different stations:(1) VITS Generator (2) Digital Multimeter : 05 nos for different stations. (3) Battery Charger 24V/25A: 01 no, for use at different VLPTs in case of emergency. (4) Soldrering stations : 05 nos for use at different VLPTs.
23/01/2012 13:23:34
 
16
Minimum one new Earth pit each at all four LPTs & twelve VLPTs is reqd. as earth resistance is high.
23/01/2012 13:26:51
 
17
Comoponents requirements for different LPTs/VLPTs under DMC Mandi :- (a) RF Transistors MRF 329 & UMIL 100A : 06 nos each for repair/as spare for 50 watts PA of DD-1& DD News (b) IC Hybrid Amplifier BGY 55 for repair of 10 watts PA.(c) Jumbo Connector for 7/8 inch RF feeder cable : 03 No for replacement at VLPT Sarkaghat & Shivabadar. (c) RF Tr. UTV 200, BLW 32 ,BLW 96 for repair of 50 watts PA of VLPT Jhatingri. (d) MOSFET 543W, 544P & 544B& MRF 377 : 02 nos each ,as spare for 300 watt PA. (e) IC Distribution Amplifier GMC 061: 02 nos for repair of Video processor of VLPT Jhatingri.
23/01/2012 16:06:34
 
18
Request to consider for arranging permanent contructed building in place of the exsisting Porta Cabin at LPT Sundernagar.The porta cabin was constucted in the year 1998 & its condition is detorating .
06/03/2012 13:05:36
DMC MATHURA
1
Replacement of DD1 BEL 100 W Ch 8 XTR of LPT Alwar, commissioned in 1984.
23/01/2012 12:26:33
 
2
The DD2 Antenna at LPt Alwar has lost its verticality due to breakage of angle support. Report already sent to ZO to be repaired under PRG..
23/01/2012 12:29:24
 
3
UPS 6KVA installed at LPT Aligarh in 13.7.2009 is giving frequent faults. Full battery banks of 12V 26AH,Qty 20 are to be replaced. Its Invertor card is also suspected.
23/01/2012 12:33:07
 
4
LPT Bharatpur IF Channel is faulty.
23/01/2012 12:36:53
 
5
LPT Baswa RF Feeder Cable 7/8 is required due water entering in cable. This has been drained at present. The condition of Guy wire of Mast antenna is in bad contioned.These requires replacement. Mast also requires painting.
23/01/2012 12:42:06
 
6
At LPT Karauli nut bolt of SS 45 M mast requres tightening.
23/01/2012 12:43:53
 
7
DD 2 LPT Aligarh 300W PA two no & SMPS 30V/50 A Two no have been received after repairs , These were installed on 25.11.2010. One PA failed on 9.05.2011 & second PA plus two SMPS failed on 12.12.2011. At present both PAs are giving 80 W at sync peak by taking current of 13.0 A. Both Exciter UHF Ch 27 are also faulty and lying at station. Kindly these may be got repaired.
23/01/2012 12:49:40
 
8
At LPT Deeg one split AC of Hitachi instaled in 9/2010 compressor failed on 08.July2011. To be repaired under warranty. No information regarding Bill, Order No, etc is available to LPT /DMC.
23/01/2012 12:55:59
 
9
VLPT Battery Bank for Sikarai was diverted to VLPT Rajgarh. Maintenance free battery bank of 1600 AH is required for VLPT Sikari.
23/01/2012 13:06:43
 
10
LPT Deeg 500w (1+1) Ch 25 & LPT Mathura 500w (1+1) Ch 24 do not have any spare component or modules such as PA, SCU ,NRSU. It is requested that these may be provided.
23/01/2012 13:11:07
 
11
Mast Light LED type is required for LPT Aligarh.
23/01/2012 13:14:37
 
12
Security Lights 20 No are required for 12 LPT & 2 VLPTs.
23/01/2012 13:15:40
 
13
500 MHZ Digital CRO is required for DMC.
23/01/2012 13:16:19
 
14
Window Ac 8 NO ( LPT Aligarh, Karauli-2, Baswa,Nagar-2, Kosi,Alwar) & Split Ac 8 No ( LPT Kishangarhvas, Ferozpurjhirka , Kosi Kalan, Hindaun City) are required.
23/01/2012 13:21:17
 
15
Two number Audio / Video Switcher are required for LPT Bharatpur & Karauli.
23/01/2012 13:23:04
 
16
TV receiver 10 No & LCD 12 no are required for LPTs.
23/01/2012 13:24:18
 
17
IRD Scopus Six No for Hindaun, Karauli, Firozpurjhirka, Kosi, Nagar , Aligarh.
23/01/2012 13:25:45
 
18
VHF TV Demodulator for Alwar , Karauli, Nagar, Baswa. Clamp on meter five no, Digital Earth tester three no, Digital Multlmeter Six no, Soldering station Six no for DMC Mathura.
23/01/2012 13:36:23
 
19
Battery for Site Master Anritsu S 332 D , 10.8V Nickel Power Corporation
23/01/2012 13:38:10
 
20
Computer with printer 8 No for LPTs.
23/01/2012 13:39:03
 
21
SMPS 28V/52A Six No for Bhartpur, Karauli, Aligarh two each. Wave Form Monitor for Bharatpur & Deeg.
23/01/2012 13:40:57
 
22
Photo Copier for DMC Mathura.
23/01/2012 13:41:32
 
23
Lifting of road & gate at LPT Bhartpur to stop rain water entering ,due to uplifting of approach road. Size Six feet X Fifty feet x Two feet.
23/01/2012 13:44:40
 
24
Painting of Porta Cabin at Alwar & Kosi.
23/01/2012 13:46:48
DMC NAINITAL
1
LPT NAINIDANDA: a) one 6.2 spare PDA required as no spare dish avaliable due to damage of dish because of high velocity wind. b) one spare PA 50W required for BEL-131(100W) c) one spare 28V /10A Power supply (SMPS) MAKE DIGITRONICS (MODEL-A0280-12) d) Lighteningarrestors for power supply and R.F. lines
08/02/2012 12:11:56
 
2
LPT HALDWANI: a) one power supply AC TO DC for exciter of GCEL 100w VHF( 121-2) b) Modulator CH#9 or Multichannel c) Power supply 28V /50A SMPS make digitronics (model A1400-11) d)Lightening arrestors for P.S. and R.F. lines
08/02/2012 12:18:14
 
3
LPT NAINITAL: a) Cracks have developed in builiding of LPT and area around staff quarters is sinking , it needs through examination by CCW and remidial action on priority basis. b) Spares to be provided with webel 500w (CH#26) transmitter on commissioning.
08/02/2012 12:21:42
 
4
VLPTs ( BASOT , JAURASI, MANILA , RANIKHET ) a) 2 nos battery chargers required as spare for all VLPTs. b) 4 Nos 24 V operated IRDS, one for each VLPT. c) lightening arrestors for R.F. and P.S. lines for all VLPTs d) 4 nos power supply of PA of 10W GCEL- 126 transmitter e) 2 nos control cards for SPV CHARGER
08/02/2012 12:35:46
DMC PATHANKOT
1
The Station Control Unit of LPT Gurdaspur was failed on 3.11.10 and was sent for repair to WEBEL on 26.6.11. The firm has submitted an estimate of Rs 96,500/- for repairing charge. The case was sent for A/A to Zonal Office on 11.11.11.While secruitinizing the AT No:- 1402 it is found that M/S WEBEL supplied this unit @ of Rs 75000/- alongwith some sensors and cables. May I like to request you that decision for repair or procurement of new unit be taken accordingly.
24/01/2012 17:05:37
 
2
One 500 Watt PA of LPT Gurdaspur was gone defective on 21.1.11 within warranty as the station was commissioned on 25.10.10.This PA was sent to M/S Twin Engineers Baroda as directed by the Directorate in month of March,2011. Now the last communication received by this office on 15.12.11 that the fault has been identified and some spares are awaited from abroad. Matter may please be taken up with WEBEL for early repair and Warranty extension. The unit received back after on 21.2.12. Working satisfactory.
24/01/2012 17:10:21
 
3
The battery banks of VLPT Tissa and VLPT Chawari are installed in the year 2010 and 2011 respectively and have served their useful life.The batteries of both the banks are discharging abruptly, and do not get charged fully and low backup. So both the banks are required to be replaced. Therefore two numbers of maintenance free lead acid battery banks may please be provided for these VLPTs.
27/01/2012 11:38:40
 
4
Regarding damage of RF Feeder cable at VLPT Chawari Khas.On dated 1.9.2011 Maintenance team of DMC Pathankot visited VLPT for routine maintenance, the lock of the Porta Cabin found broken and RF Feeder Cable damaged by cutting by some miscreants. The incident was reported to Local Police Station and the report was sent to Z/O also for kind information. One Low Loss cable of 50M Length ( Available as spare for using with receive system) arranged from DMC and installed in place of Damaged cable. Although reflected power is not indicated on Power Meter but this is a temporary arrangement. So you are requested to arrange 7/8 “RF cable of 45 Meter length with both ends N-male Connectors. It is also possible to joint the damaged cable if two N type Male connectors suitable for 7/8” Dia RF Cable with N type I connector will be arranged.
27/01/2012 11:51:15
 
5
Almost all the equipment was stolen away from the transposer Talwara by the thieves in diffrent spells and FIRs were lodged every time. To revive the station, new transmitter setup is required to be installed. List of which was sent Zonal office vide this office letter dated 6.8.2010. The present site of the Transposer is located at remote far away from Talwara township tempting thieves easy approach. It is proposed to shift the site somewhere in the township or provision of attandent round the clock.
27/01/2012 11:55:44
 
6
Three AIR 100 Watt FM Transmitters were installed the premises of VLPTs at Bharmour, Chamba and Chowrikhas working on AC Mains. The keys of these VLPTs is lying at DMC or with Resident Technician at Chamba. The problem being faced at Bharmour and Chowrikhas is one man has to be deputed from DMC when some maintenance work required to be carried out at FM transmitter by the AIR Staff. An advise is sought whether DMC should hand over one key to AIR official or to follow the existing procedure. Also extension of Load with Electricity Supply Athourity.
27/01/2012 12:00:46
DMC PAURI
1
Post of Assistant Engineer of LPT Bacher has been transfered to LPT Nainidanda.As DMC Pauri is looking after 14Nos of VLPTs installed in remote locality of district Pauri,Rudraprayag & Chamoli.One Assistant Engineer is very much required at LPT Bacher to help in maintaining of VLPT installed near by
24/01/2012 15:55:14
 
2
Three post of EA at LPT & One post at DMC Pauri are sanctioned ,but no any EA is posted at present .Shri Bhandari Prashad ,EA was transfered from HPT Lakhimpur vide CE(N/Z) orderNo 16/2011 dated 10-03-11 in place of Shri Munna Rao EA .Shri Bhandari Prashad EA did not join till date. Action may please be taken to releive shri Bhandari Prashad & one EA may also be posted at LPT Pauri
24/01/2012 16:10:52
DMC PILANI
1
Section-B Agenda points for Conference 2011 are as under :- 1. There are 12 nos. of LPTs and 1 VLPT under the control of DMC, Pilani. The sub-head wise approved Budget Estimates and LOC being received are insufficient due to which booking in most of the sub-heads could not be made proportionately. It is requested that Doordarshan Directorate may kindly be approached/recommended to enhance the Budget Estimates alongwith LOC to ensure the smooth functioning.
26/03/2012 15:06:31
 
2
2. There is acute staff shortage at LPTs, especially at LPT, Chirawa, Taranagar & Rajgarh. At LPT, Chirawa, only 1 Sr.Tech. and 2 Technicians, at LPT, Taranagar, only 1 AE and 1 Technician and at LPT, Rajgarh only 1 EA, 1 Sr. Tech. and 1 Technician are posted. The 2/3 staff members are not even sufficient to perform single duty in three shifts. So, the staff from other LPTs are to depute there to perform the duties which cause pooling up of OTA & TA claims.
27/03/2012 11:47:51
 
3
The Building owners create lot of problems from time to time because the lease agreements are of very short period. Apart from it, assessment of rent cases are delayed by Civil Construction Wing, Jaipur officials as they delay the matter for so long resulting in executing the new /revised lease deed agreements. The rent assessment of LPT, Taranagar is pending at CCW, Jaipur. They may be asked /instructed to assess the rate shortly. State Govt. has the provision to enhance the rent by 5% every year without assessment. Insertion of this clause into the lease deed agreement may be a solution to some extent. The renewal of lease deed agreement in respect of LPT, Chirawa has to be effected w.e.f. 01-09-2008. The rates has been assessed by Civil Construction Wing, Jaipur Rs. 5089/- P.M. on the basis of principal rate and Rs. 5971/- P.M. on the basis of market rate. The rates assessed by CCW, Jaipur are not accepted by landlord and he demanded Rs. 10000/- P.M. It is, therefore, that guidance/instructions may be issued to sort out the matter.
27/03/2012 11:48:43
DMC POONCH
1
Strengthening the transmission of DD signal in sensitive border region of Surankote under Poonch district by using satellite downlink as input signal. Can be done by using the station resources.
19/04/2012 12:38:32
 
2
Battery banks required for VLPT Mandi and VLPT Louran under DMC Poonch as replacement to old and damaged battery banks of 8-10 years old. The required details are 24 Volt, 3400 AH.
19/04/2012 12:41:33
 
3
AC Battery Chargers (24 Volt, 40 Amps) required for VLPT Mandi and Transposer Surankote as replacement for defective Battery Chargers.
19/04/2012 12:43:19
 
4
Battery set for UPS at LPT Poonch to avoid interruption during change-overs from City supply to DG set or vice-versa. This is required as replacement to damaged battery sets.
19/04/2012 12:45:19
 
5
Requirement of Power Amplifier for 100 Watt BEL Transmitter as there is no stand-by available. PAs for GCEL 10W (VLPT Mandi) and 50W (VLPT Louran) and 10W(Surankote Xposer) are required.
19/04/2012 12:48:19
 
6
DG room is required at LPT Poonch within the AIR/DD precinct as presently there is only temporary arrangement.
19/04/2012 12:49:43
 
7
Painting of self supported/ Guy Mast at Xposer Surankote is required as there was no painting to the Mast since installation in 1989-90.
19/04/2012 12:51:50
 
8
Revival and re-validation of A/A and E/S for new Office Vehicle for DMC Poonch.
20/04/2012 11:24:01
DMC RAJOURI
1
Power Amplifiers for VLPTS: Requirement for BEL make 50 Watt VLPTs (Channel Nos. 6, 7 and 8) as the stand-by PAs in the chain are defective and found not possible to repair at local level. Power Amplifiers for GCEL/ Webel make 50 Watt VLPT (Channel Nos 27) as stand-by PA is lying in Zonal Office for last more than three years
31/01/2012 17:15:35
 
2
Change of frequency for VLPT Manjakote: Change of frequency of VLPT Manjakote (Ch 27) is proposed due to interference with HPT Nowshera (Ch 27) in some parts of the coverage. Large tract of Manjakote population is covered by VLPT Manjakot only, not possible to cover it by HPT Nowshera.
19/04/2012 13:08:05
 
3
Power Amplifiers for LPT/ MLPT required: PAs for 100 Watt BEL make LPT Rajouri and MLPT Darhal required as there are no stand-by PAs available.
19/04/2012 13:09:54
 
4
Battery banks for VLPTs: Provision of 18 battery banks of 24 Volt, 3400 AH for 7 VLPTS as replacement to old and damaged battery banks of 8 – 10 years old. Each battery bank comprises of 12 Cells of 2 Volt and 3400 AH each.
19/04/2012 13:11:06
 
5
AC Battery Chargers (24 Volt, 40 Amps) for VLPTs: 2 numbers as replacement to old and defective Battery Chargers at 2 VLPTs (VLPT Tatapani, VLPT Manjakot)
19/04/2012 13:12:18
 
6
Battery sets for UPS at LPT/ MLPT: 2 sets (Each set has 20 batteries – 12 Volt, 26 AH) as replacement to damaged battery sets
19/04/2012 13:13:46
 
7
Professional IRDs: Supply of 18 nos. of professional IRDs (DC operated, 12/ 24 Volt) for 7 VLPTs to replace the existing commercial IRDs
19/04/2012 13:15:22
 
8
Measuring equipment: Through-line Power meter (UHF 50 Watt/ 100 Watt), for VLPTs and Maintenance Workshop.
19/04/2012 13:16:54
 
9
Civil Works: Additional Office space is required for DMC Rajouri and Poonch as the available space is not sufficient. Sufficient Open space is available for provision of additional porta cabin(s) within the office area.
19/04/2012 13:19:16
 
10
Painting of Self supported/ Guy Mast: At LPT Rajouri, VLPT Budhal, VLPT Thanamandi as the painting of these masts is overdue.
19/04/2012 13:20:53
DMC RAMPUR
1
LPT Rampur,LPT Moradabad,LPT Sambhal,Kashipur & Amroha are working satisfactory.
28/01/2012 15:54:39
 
2
SCU of LPT Kashipur of 500W Webels XTR is working satisfactory after repair from Webels Barodara. Its PA was repaired from Webels & taken in circuit Working OK. However M/S Webels is requested to align the transmitter on site for max power O/p
28/01/2012 15:57:45
 
3
SMPS BEL33V/26V -2Nos of UHF BEL MUV199 DDNews transmitter of LPT Moradabad are defective & urgently required to be procured.
28/01/2012 15:59:46
 
4
Battery bank of VLPT Khubia Nangal was not working satisfactory & it is required to be replaced with new bank.
28/01/2012 16:00:50
 
5
Proposal of Rent accessment of LPT Sambhal was forwarded to O/o ADG(NZ). It is requested to approve the rent as fixed by CCW ( Aprox: Rs19,000 per month).
03/05/2012 13:15:51
DMC SHIMLA
1
Painting of guy wired Masts of LPT-Bilaspur (45m high) , VLPT-Bandla (30m high) & VLPT-Kalpa (30m high) required.
25/01/2012 21:42:46
 
2
Maintenance free batteries for VLPT Chopal (24V/1600AH), VLPT Rohru (24V/1600AH), VLPT- Kotkhai (24V/1600AH) & VLPT-Kaza (24V/2500AH) are required.
25/01/2012 21:46:13
 
3
Measuring equipments such as site-master/ spectrum analyser, GPS meter, Neutric/DNL meter are required for DMC Shimla.
25/01/2012 21:51:27
 
4
Wave form monitor & two Nos. LCD/LED TV are required for LPT Rampur.
25/01/2012 21:51:40
 
5
Spare components - RF Transistors UMIL-100A, TVV-100/ TPV-3100, PTB-20101, VTV-150 are required.
25/01/2012 21:58:16
 
6
One No. spare 7.5m Dia, BEL -make, motorised PDA is lying at LPT Bilaspur, requested to shift to other station. One No. dismentled 6.2m Dia, BEL-Make, PDA of LPT Rampur is required to be shifted to other station due to audit objection.
25/01/2012 22:06:03
 
7
Request to fill up the vacant posts of DDE/ SE & EA of DMC, because these are the only two sanctioned posts in DMC Shimla & both are vacant.
25/01/2012 22:11:30
 
8
Request to fill up the vacant posts of AE & EA in LPT Rampur.
25/01/2012 22:13:46
 
9
Transmitter of LPT-Bilaspur may be shifted shortly & there is no spare room to install the new transmitter. So it is requested to construct a new room or install the Porta cabin.
25/01/2012 22:20:34
DMC SRIGANGANAGAR
1
1. Shortage of staff at LPTs- There is acute shortage of staff at LPTs under control of DMC Sriganganagar in the cadre of AE, SEA, EA,Helper & Security Guards. There are 7 LPTs under this office & No AE on Anyware & 1 SEA at LPT Sriganganagar is posted. In EA cadre there are only 2 EA posted at LPT Sriganganagar & Ferozpur respectively. It is quite difficult to run smooth Transmission with 2 or 3 staff at LPTs. The post of Station Engineer at DMC Sriganganagar is also lying vacant since 25-05-2007.
30/01/2012 13:54:04
 
2
Doordarshan Maintenance Center and Relay Center SriGanganagar were established in 1984 in rented building of Muncipality Committee, SriGanganagar. Mash Wire had been used for boundary but due to edging and wear & tear it damaged. A new boundary wall is required for security purpose.
30/01/2012 13:54:55
 
3
LPTV Suratgarh- Exciter of 500 Watt (1+1) Auto Mode Make BEL Transmitter is faulty & Presently only 1 Transmitter is working. LPT SriGanganagar- PA, Exciter & Transmitter Control Unit of 1 Transmitter (Auto Mode 1+1, 500 Watt Make BEL) is faulty since 22-02-2008, Presently only 1 transmitter is working.
30/01/2012 13:55:35
DMC SRINAGAR (NORTH)
1
1.Budget . In adequate funds are provided in various heads viz OE & OTA for mainting and smooth functioning of DMC(north) 2. Up-Gradation of VLPT Uri to LPT. It is proposedthat VLPT Uri may be upgraded to LPT .Because of termendous viewing ,as the Uri is far flung border area and is constituted with 2.5lacs population, so the VLPT is not fulfilling the demands of viewing the DD National & DDKashir . There is tremendous pressure from the local MLA, and the pepole of Uri, keeping in this sensitiveness of place and border area so it is necessary to up-grade VLPT to LPT 2. Up gradation of Solar system 2.2Amp to 4.4 Amp for VLPT Uri. 3.Sparesfor 2*50Watt WEBEL Transmitter . 1. PA Monitor board. 2. video input module. 3. IF converter. 4. Upconverter . 5. synthesizer. 6.IF carrier generator. 7. Aural module. 8. DCto DC converter. 9. Feeder Cable 70Mtrs. 10. Battery bank 1650Ah for VLPT Boniyar as the present battery bank has already completed its normal life. 11. 15 Nos 4.4 Amp Solar palates for VLPT Boniyar. 4.Spares required for 2*10Watt GCEL-126. transmitter. 1. Battery Bank 1650AH. 2. Feeder Cable 50Mtrs 3. Up gradation of solar system 2.2 Amp to 4.4 Amp. 4.PDA 6.2 Mtrs (BEL make ) for VLPT Baramullaha.
24/01/2012 14:23:46
 
2
1.Spares for 500watt BEL make transmitter. 1. MOSFET BLF378 2. MOSFET BLF346. 3. Generator for MLPT Pattan presently two numbers of generator 14KVA Honda make SAWA-Fuji are installed in the Mobile Van . Spares for these generators are not available,even the fillters are not available in the market ,also all these generators have surived their usefull lives. Now ,it is proposed that new generator of 15KVA capacity for MLPT Pattan may be provided. 2. Providing of 10Kwatt AVR with input voltage 50 volts
24/01/2012 14:28:55
 
3
1.Spares for 500watt BEL make transmitter. 1. MOSFET BLF378 2. MOSFET BLF346. 3. Generator for MLPT Pattan presently two numbers of generator 14KVA Honda make SAWA-Fuji are installed in the Mobile Van . Spares for these generators are not available,even the fillters are not available in the market ,also all these generators have surived their usefull lives. Now ,it is proposed that new generator of 15KVA capacity for MLPT Pattan may be provided. 2. Providing of 10Kwatt AVR with input voltage 50 volts
24/01/2012 14:29:40
 
4
1.Spares for 500watt BEL make transmitter. 1. MOSFET BLF378 2. MOSFET BLF346. 3. Generator for MLPT Pattan presently two numbers of generator 14KVA Honda make SAWA-Fuji are installed in the Mobile Van . Spares for these generators are not available,even the fillters are not available in the market ,also all these generators have surived their usefull lives. Now ,it is proposed that new generator of 15KVA capacity for MLPT Pattan may be provided. 2. Providing of 10Kwatt AVR with input voltage 50 volts
24/01/2012 14:30:33
 
5
1.Spares for 500watt BEL make transmitter. 1. MOSFET BLF378 2. MOSFET BLF346. 3. Generator for MLPT Pattan presently two numbers of generator 14KVA Honda make SAWA-Fuji are installed in the Mobile Van . Spares for these generators are not available,even the fillters are not available in the market ,also all these generators have surived their usefull lives. Now ,it is proposed that new generator of 15KVA capacity for MLPT Pattan may be provided. 2. Providing of 10Kwatt AVR with input voltage 50 volts
24/01/2012 14:30:57
DMC SRINAGAR (SOUTH)
1
Acute shortage of staff in ministerial cadre.Deployment of staff against vacant posts in ministerial cadre is required at the earliest.
26/03/2012 14:24:04
 
2
BEL 500 W 1...Air conditioner = 02 nos (as both are defective). 2...15KVA Generator (as 14KVA, Sawafiji SH15D is un serviceable due to non-availablity of parts). 3...UPS battery bank 12v/26Ah (20 nos) 4...PA Pallet amp (Part no.114002321893) = 02 nos 5...Driver pallet amp (Part no.114002420542) = 02 nos
26/03/2012 14:24:44
 
3
BEL 2X50 Watt 1...Battery bank (2.2v/2500AH) 2...AVR 3KVA (input voltage 70-260v) 3...Interface unit = Control card 4...Power amplifier spares = BLF 278 (02 nos), linearity corrector board (01 no), BLF 346 (02 nos) 5...For exciter = VSB mod board,IF & aural mod board,synthesizer module 6...Control unit = control card
26/03/2012 14:36:14
 
4
BEL 2X50W 1...Battery bank (2.2v/2500AH) 2...Control unit = control card 3...For exciter = VSB mod board,IF & aural mod board & synthesizer unit
26/03/2012 14:39:03
 
5
GCEL 2X10 W 1...One complete PA (ch.10) 2...Solar panel (18v/5.5A) = 7 nos. 3...Spares for PA power supply = IRF BUZ 36, SCR SS 5228. 4...Channel filter (ch.10) = 01 no
26/03/2012 14:49:27
 
6
WEBEL 2X50 W 1...Battery bank (2.2v/2500AH) 2...Exciter units = Video input processor, vision modulator, IF Combiner & Corrector, Audio processor, aural modulator, DC DC Convertor & local oscillator 3...Exciter power supply = 01 no
26/03/2012 14:56:29
 
7
GCEL 2X10 W 1...Solar panel (18v/5.5A) = 10 nos. 2...Battery bank (2.2v/2500AH). 3...Spares for PA power supply = IRF BUZ 36 (02 nos), SCR SS 5228 (02 nos).
26/03/2012 15:00:03
 
8
WEBEL 2X50 W 1...Power amplifier complete (ch.31) 2...Complete exciter. 3...Battery bank (2.2v/2500AH). 4...Transister UTV 200 = 02 nos.
26/03/2012 15:05:01
 
9
WEBEL 2X50 W 1... One complete PA ( Ch.34) 2..Battery bank (2.2v/2500AH) 3...Solar panel (18v/5.5A) = 19 nos.
26/03/2012 15:09:18
 
10
WEBEL 2X50 W 1... AVR 3KVA (input voltage : 70-260v) = 01 no 2...Battery bank (2.2v/2500AH)
26/03/2012 15:11:04
DMC UDAIPUR
1
Problems in 500W(1+1) auto transmitter at LPT Sirohi:- Exciter ,PA, SCU repaired by WEBEL in guarantee period, but did not run smoothly even for 3 hours. Needs proper repairing and testing at site by WEBEL. Guarantee period needs also to be extended accordingly.
28/01/2012 11:50:20
 
2
Replacement of transmitter of LPT Nathdwara:- Existing Tx of LPT Nathdwara has been commissioned in 1992 but it has completed its useful life as it was diverted from Aurangabad at that time. Transmitters of that era is already under replacement scheme. Guyed mast also needs replacement by self supported mast .
28/01/2012 11:51:46
 
3
Construction of DMC building ,Guest House and shifting of LPT on PGF Land:- There is no Doordarshan guest house available at Udaipur . Doordarshan officers visits Udaipur time to time. Due to costly hotels and non availability of govt. accommodation , visiting officers face problems in stay. Guest house may be constructed at PGF site .DMC is running in rented building and already there is audit para ,hence DMC and LPT could be shifted on PGF land alongwith guest house.Provision could be kept for future planning of PGF on this land .
28/01/2012 11:53:01
 
4
Requirements of modules,MOSFETs and other components for 500 W(1+1) Auto transmitter of LPT Udaipur,Dungarpur and Banswara:- 1.MOSFET SML D 1030 UK-4 nos. 2.MOSFET LDMOS MRF377-8nos. 3.PCB Assy station control board 2- 02 nos. 4.Microcontroller IC DGTL UP MC 9S12A256 CPV-02 nos. 5.VHF Mixer-01 no. 6.Chip resistance 50 Ohm, 30W- 02 nos. 7.PA control board -02 nos. needs repairing/tunning .
28/01/2012 11:53:50
 
5
Administrative approval is required for one more telephone connection at DMC and at each LPT having 500W auto transmitter(Banswara, Udaipur, Dungarpur, Sirohi) for remote monitoring of these auto transmitters at DMC.
28/01/2012 11:55:11
 
6
6 KVA UPS- 6 nos are required for LPT Sagwara, Kushalgarh,Nathdwara , Mount Abu,Kesariyaji & Udaipur DD#news to prevent Momentary interruption and for smooth operation of other equipments.
28/01/2012 11:55:49
 
7
Lightening protection system is required for all 11 LPTs. LPTs are located in hilly areas of Aravali so these are in lightening prone area.
28/01/2012 11:57:46
 
8
Requirement of 5 nos. of SMPS 28V/2A as spare for BEL MVV 137 transmitters (LPT Kesariyaji, Mount Abu, Kushalgarh, Sagwara and Udaipur DD#news)
28/01/2012 11:58:25
 
9
12 Nos. of LCD Monitor 19inch for Monitor Rack are required at (LPT Banswara, Dungarpur, Kushalgarh, Kesariyaji, Mount Abu, Nathdwara, Sagwara, Salumber, Sirohi, Udaipur DD#1, Udaipur DD#news, & Vallabhnagar)
03/05/2012 13:10:55
 
10
Civil work: Building rooftop treatment work at LPT Salumber. It is very essential to stop rain water leakage in whole building.
03/05/2012 13:16:35
 
11
Computers are need of today, hence 11 nos. of computer sets including printers are required for smooth working at all 11 LPTs .
03/05/2012 13:29:32
DMC UDHAMPUR
1
Permanent Setup for DMC Office:- Present DMC Office is operating from a portacabin and there is no sufficient space for office/workshop and engineering stores. It is purposed to get constructed permanent setup for DMC Office. The Portacabin is made of asbestos from inside in tin sheets from outside. It is small enough to accomodate to DMC staff, stores, workshop etc. The portacabin has served more then 07 years.
25/01/2012 15:23:18
 
2
To monitor the status of Unmanned VLPTs:- Unmanned VLPTs under DMC Udhampur are located in the hilly and far flung areas. In the absence of regular employee i.e., either technician or helper, at these VLPTs, the work is entrusted upon locals through contractor to convey the working status of VLPTs etc and to report any matter regarding security of the installation. The matter needs to be addressed by providing a sanction for the same.
25/01/2012 15:23:51
 
3
One No. of PA (300W UHF 24(.0 (GCEL make) is required as spare for LPT Udhampur
25/01/2012 15:24:11
 
4
Up Gradation/ replacement of GCEL make 10W VLPTs:- Up Gradation/ replacement of GCEL make 10W VLPTs at Doda, Bhadarwah, Kishatwar. The VLPTs have served more than 20 years of life and also GCEL spares like DC-DC converter, Aural Modulator etc are not available. In the event of of replacement of VLPTs, new maintenance free batteries of requisite capacity may also be required to run the new transmitters as old transmitters are operating on electrolyte filled low capacity batteries.
25/01/2012 15:24:26
 
5
Earthing at some of the VLPTs and one LPT (Udhampur) is required to be refurbished where as some of the earth pits are required as new because the areas of VLPTs and LPT are sandy, rocky or mixed
25/01/2012 15:24:42
 
6
Shortage of Staff:- a) Ministerial:- Against the sanction strength of one each of HC/Acctt., UDC, LDC; only one UDC is present and rest of the two posts are lying vacant since the last five years or so. As a result a lot of work either remains pending or piled up. b) Engineering:- 01 Post of EA at LPT Udhampur is lying vacant. Also 01 post of resident technician has fallen vacant at VLPT Doda. The posts need to be filled up as there are no technical post sanctioned for DMC Udhampur except the post of SE DMC. It is worth mentioning that DMC Udhampur is looking after 08 VLPTs located in the far flung and militancy prone areas of Districts Udhampur and Doda with the help of technical staff from LPT Udhampur only.
25/01/2012 15:26:17
 
7
Disposal of maintenance free old batteries from VLPTs:- The defined life in the ledgers has been 10 years, though batteries have exhausted with in 05 yaers or so. As a result the batteries still have book value in lakhs of rupees. Also a lot of space has been occupied by the exhausted batteries in the otherwise small portacabins.It has become very difficult for the station to auction these batteries. Some method needs to be devised so that the batteries could be auctioned. The disposal of such like material has been pointed out by the audit also.
25/01/2012 15:27:03
 
8
A pakka room may be provided at LPT Udhampur in addition to the existing setup (till the permanent setup for DMC office comes up). The room is to be used as a workshop to carryout the repairing work which is presently being carried out at LPT Engineers room which is otherwise very small. Also the present LPT (500W UHF) and 01 radio FM transmitter 100W are installed in the small transmitter hall which was earlier being used for VLPT Udhampur.
25/01/2012 15:31:10
 
9
One more pakka room may please be provided for accomodating AE LPT Udhampur as there is no such room for AE. In the present set -up at DMC Udhampur only one room has been provided . However in the event of transfer of AE at LPT (which is already under the order of transfer to LPT Udhampur ) it will be very difficult to accomodate both the AEs in the same room at DMC Udhampur.
16/03/2012 11:22:19
 
10
replacement of battery bank (12v x 20) provided for 6 KVA UPS for 500w LPT at Udhampur. The present installed batteries in the above reffered UPS has served more than 03 years of effective service and the back-up time has reduced to merely 02 to 03 minutes.
02/05/2012 14:10:11
DMC UTTARKASHI
1
The 24 Nos. Maintenance free batteries which were received DMC Uttarkashi in April, 2010 was meant for VLPT Bhatwari. The same batteries are installed at VLPT Uttarkashi to meet the requirement. Therefore, it is requested to kindly provide 24 Nos. more batteries against VLPT Uttarkashi for replacement of batteries at VLPT Bhatwari which have served their life.
30/01/2012 11:39:57
 
2
Shortage of staff at LPT New Tehri in the cadre of Engg. Asstt. . No Engg. Asstt. is posted at the LPT New Tehri so far Against 01 No. of sanctioned post & 01 No. post received in Redeployment Scheme/Temporary from DDK Jalandhar.
30/01/2012 11:56:12
HPT AGRA
1
DD-1 Transmitter is very old and it is in the list of replacement scheme. It is to be replaced soon.
29/01/2012 20:09:15
 
2
The floor of the HPT building is in very poor condition. An estimate from CCW for fixing vitrified tiles has been submitted.
29/01/2012 20:14:40
 
3
LED Mast light is needed.
29/01/2012 20:15:26
 
4
Six nos of AC are required since the ACs of the Transmitter are very old and giving frequent trouble.
29/01/2012 20:17:09
 
5
LCD Monitors are rquired. Four nos 14 inch and two nos 32 inch.
29/01/2012 20:20:23
HPT AJMER
1
1.NEC 10KW-NATIONAL-LOW POWER DUE TO SPARES OF PA MOSFET, CIRCULATORS,ETC. 2.ONE EXC. OF NEC GIVING LOW POWER. 3. R&S 20KW- THREE PRE AMP OF PA FAULTY-COULDNT REPAIRED, ONE P/S OF PA NOT WORKING-SO SPARE PA ARE NOT WORKING. 4.CCU OF R&S TX IS NOT COMMUNICATING, ITS ONE EXC IS NOT BOOTING, ITS S/W VERSION IS NOT AVAILABLE WITH STATION. 5. WINDOW A/C 1.5 TEN NOS TO BE REPLACED. 6.UPS/BACKUP FOR 10KW NEC & 20KW R&S MAY PL BE PROVIDED 7. LED MAST LIGHT TO BE INSTALLED
30/01/2012 15:05:07
HPT AMRITSAR
1
no spare PA for NEC is available.as the XTR is to be upgraded soon to 20 KW 4 spare PA are reqd.
16/02/2012 11:59:22
 
2
spares for Thomcast XTR Like BLF 278 nd other modules as per list already sent.
12/04/2012 12:41:46
 
3
The case for replacement of Vehicle wasc sent in 2008 and is still pending since 2008.
04/05/2012 15:46:11
 
4
staff shortage for operational duties. 3 posts of EA and 4 posts of Tech are vacant
04/05/2012 15:46:52
HPT BANDA
1
Replacement of old bulb type defective mast aviation light by new LED type light.
23/01/2012 11:55:08
 
2
Required measuring equipments 1) TV DEMODULATOR 2)CRO 400 MHZ 3)DNL Meter 4)waveform Monitor 5) Site Master
23/01/2012 12:01:23
 
3
L.O. of NEC XTR VHS 1401 Ch 12 is not available .Currently station is using L.O. of BEL XTR. 1 Kw HVV-166 And no standby L.O.is available at station.
23/01/2012 12:05:41
 
4
Two no new AC are required for XTR. Old AC of year 2000 are not economical for repairs & give frequent trouble..
23/01/2012 12:08:11
 
5
One no Fax Machine is required.
23/01/2012 12:10:40
 
6
Residential premises approach road requires repairs as it isin bad shape. Last time repaired in 2000.
23/01/2012 12:15:08
 
7
New borewell for HPT BANDA & its residential quarters area as existing borewell water level goes down.
23/01/2012 12:16:53
HPT BARMER
1
Urgent requirement of 8F valves at least TWO Numbers (02 Nos.) . No spare valve is available. One in Ckt. and another is having low gain.
31/01/2012 15:41:37
 
2
TV Demodulator is required at HPT Barmer.Existing old is not working . HPT Barmer is situated at Chohtan Hills with 11 KM hill road. It is very difficult to bring and send back the sophisticated equipments from other Stations for measurements.
31/01/2012 16:04:24
 
3
Shortage of Engineering Staff. One post of SEA,Two posts of EAs,One post of Sr.Tech. and two posts of Technicians are lying vacant. It is very difficult to manage shift duties at HPT(Chohtan) Barmer which is 65 KM away from Barmer and at LPT Barmer.
31/01/2012 16:11:07
 
4
Replacement of LPT Transmitter at Barmer which was commissioned in 1984 and has completed /served its useful life i.e.more than 20years.
31/01/2012 16:18:50
 
5
Shifting of LPT Barmer from rented building of State Govt. (PWD Barmer) to our own building at City Office Barmer. District Administaration is also demanding to vacate the LPT site. At present at City office premises 45 M self supported steel mast is provided without antenna. Erection of tower work is already completed. 70 M (1 and 5/8 inch) RF cable Roll is also availabe.Two numbers of PDA foundations has already been completed. New DG set (15 KVA ) , construction of Engineers room and seperate Toilets for LPT staff, new split ACs and some renovation work will be required before shifting. .
31/01/2012 16:38:19
 
6
Two set of computers with Printers and UPS are required for one each at HPT and LPT Barmer for technical works.
31/01/2012 17:02:11
 
7
Three Nos. of IRD Scoups are required at HPT Barmer (02 Nos.) and LPT Barmer(01 No.)
31/01/2012 17:11:48
 
8
03 LCD colour monitors are required . Two for HPT Barmer and One for LPT Barmer. Old GCEL Make are not working and not repairable.
31/01/2012 17:22:52
 
9
Requirement of 185 Sq.mm., 3 1/2 (Three and Half) core armoured cable length 85 meter is required as spare from LT side of Mains Transformer(11 KV/440V) to LT Panel/Meter in LT Room. At present no spare cable is available for same. In ckt. cable was failed/bursted on 01.03.2011 and spare cable which was laid / provided by project wing was taken in circuit on same day. Now there is no spare cable is available at HPT of same rating or higher rating.
31/01/2012 17:50:51
 
10
03 Nos. of SMPS make Digitronics rating 28 Volt/ 52 Amps are required for HPT Barmer (XTR Make BEL Mark III)
31/01/2012 17:55:15
 
11
Status of LPT Barmer Staff for the purpose of duty at HPT Barmer which is 65 KM away from Barmer.
31/01/2012 18:50:21
 
12
Alocated SBG 2012-13 under subhead MV, MW,DTE and SAlary (N IRLA) is very lower side. SBG under subhead DTE for yr 2012-13 is only Rs.58000 /-. HPT Barmer is TWO year teneure Station. Most of staff is completing/completed their teneure and they are expecting transfer this year.LPT and HPT both are covered by same budget. SBG under subhead MV for yr 2012-13 is only Rs.261 000 /-. HPT (Chohtan) Barmer is 65 KM (including 11 KM hill road) away from City office Barmer at Chohtan Hills .Three office vehicle including Water Tanker are to be maintained. Water Tanker requires major repairing approx.Rs. 75000 /-.
02/05/2012 17:30:39
 
13
Requirement of New 62.5 KVA DG set. As no spare DG set is available at HPT (Chohtan) Barmer.Old existing 62.5 KVA DG set is now giving frequent troubles.HPT (Chohtan) Barmer is a very difficult site and 65 KM away from Barmer city and situated on CHohtan Hills which includes the 11 KM Hill road.Therefore repairing of DG set is quite difficult in emergency and it is very difficult to bring hired DG set in emergency
02/05/2012 17:46:52
 
14
New 15 KVA DG set with canopy is required for LPT. (1) Existing 15 KVA DG set make Greaves 2 YWA MK 5 is not working properly. Spares are not available. Engine requires complete overhauling. At present old 5KVA DG set as spare taken into ckt. (2) If LPT is shifted to City office Barmer premises than new canopy type DG set will be essential as project wing has prepared the platform with open shed only. (3) City office is in residential area and our colony is also near, so canopy type DG set is essential.
02/05/2012 17:50:30
HPT BATHINDA
1
Repair of defective Power Amplifier(BD-III,VM602A1) (02 Nos) of R&S 10kW solid state transmitter is required. One PA showed transistor fail indication and in other, supply fail indication appeared. Both PAs are out of circuit at present. No spare PA is available at the station. Apart form it, transistor of PA Sr. No. 100515, module 3B has also failed in DD-National Tx. In DD-News transmitter, 02 PA modules each of PA Sr. No. 100511, 100514 & 01 PA module of PA Sr. No. 100512 have failed. No spare parts are available at the station. The matter has already been brought in the notice of zonal office in writing as well as telephonically.
23/01/2012 13:00:46
 
2
02 Exciter Power supplies of R&S 10kW TV transmitters (01 each in DD-National & DD-News Tx.) are defective. No spare power supply is available at the station. Out of these faulty power supplies, 01 unit was repaired in the R&S Tx. workshop at DDK Bareilly but it did not work when put in circuit at the kendra. Second defective power supply is in CE(NZ) workshop for repairs. In the event of failure of the in circuit power supply of any of the transmitter, gear breakdown will occur. The matter has already been brought in the notice of zonal office in writing as well as telephonically.
23/01/2012 13:19:03
 
3
The Site Master battery (ANRITSU S331B) has completely drained out & is not getting charged. The battery has been removed from the site master to aviod damage to PCBs due to leakage. The battery is urgently required for replacement.
23/01/2012 13:32:53
 
4
Fire alarm / smoke detector system has not been provided / installed in the transmitter building. It may be provided for the safety of installation & equipments.
23/01/2012 13:37:18
 
5
One laptop may be provided to keep the softwares & data/ upgrading/ configuring of R&S 10kW DD-1 & DD-News transmitters.
23/01/2012 13:44:03
 
6
Automatic Power Factor correction panel for 03 - phase 250 kVA transformer / LT switch-gear pannel is required. The total demand load is 190kW. In the winter, the power factor comes down to 0.90 & if it falls further, the state electricity board will impose panelty.
23/01/2012 13:47:16
 
7
06 Nos 2-Ton split air-conditioners are required. In transmitter hall, the compressor of 02 air-conditioners have already failed. The blower motor & blower blade of indoor unit of 01 air-conditioner is defective & is not available in local market as well as from authorised dealer of M/s Videocon. M/s videocon have intimated (confirmed from toll free service helpline) that the model of air-conditioners installed is out dated & company has stopped supplying its spares. These units were installed at this kendra during installation in 2006. Hence 02 units for replacement & 04 units for establishment of vocational training room for diploma / engineering students may be provided. 05kVA voltage stabilizers (05 Nos.) have already been received at the station supplied through D-6 Go-down in 2011.
23/01/2012 13:58:09
 
8
Internal renovation of toilet & bathroom of AGD in office complex is required as it is in very bad condition. The CCW(C) estimate for Rs. 1,92,955/- has already been submitted to ADG(E)(NZ-DDM) for A/A & E/S.
23/01/2012 16:42:46
 
9
Repairing and Internal/External finishing of boundary wall of Office premises & colony is required. The plinth level of adjoining roads has been raised by CPWD from two sides, which resulted in weakening of boundary wall strength. The boundary wall has already collapsed four times from different stretches in the past. It needs urgent repairs & strengthening. A letter to CCW(C) was written for submission of detailed estimate & is awaited.
23/01/2012 16:53:17
 
10
One module of ATV encoder of R&S 10kW TV transmitter may be provided as standby arrangement.
24/01/2012 16:18:49
 
11
Station is facing acute shortage of staff. The post of DDE is vacant since 15.07.2009. Apart from it, 02 posts of Helper, 03 posts of Technicians, 01 post of EA are vacant since long time.
28/01/2012 08:13:33
HPT BIKANER
1
1. Reception of DD News :- New 10 KW R&S Transmitter (DD-1) has been commissioned on 31.10.07. 500W BEL Transmitter being used for DD-News has also been shifted to HPT site. It has been observed that the coverage area of DD-News diminishes completely at 10-12 Kilometers despite placement of Antenna at increased height of 80 Meter. This matter has already been communicated to Zonal office along with field strength survey report of 10KW HPT and 500W DD-News.
27/01/2012 15:51:24
 
2
3. Technical Staff:- Transmission services of 10KW DD-1 and 500W DD-News are being carried w.e.f 31.10.07. The erstwhile staff strength of LPT has been transferred to HPT Bikaner. The Strength is very less and two Vacancies in EA cadre and 0ne S. Technician cadre further aggravate the situation . Sometimes AE/SEA/EA heads the shift and few shifts are managed with Technicians or Technician(1) only. Important works like measurements, maintenance are also suffering due to inadequate staff strength. Additional post in the cadre of AE(1), SEA(1), Sr. Technician(1) may please be shifted from elsewhere for smooth working of HPTV.
27/01/2012 15:53:07
 
3
4. Provision of Spares:- Only Two Nos. of IRD’s have been provided with new 10KW R &S Transmitter at HPT Bikaner. Two more IRD’s are required because service of DD News through 500Watt Transmitter is also being run from HPTV site.
27/01/2012 15:53:42
 
4
6. Sanction of Telephone for SE Residence:- Only two telephones have been sanctioned for office of HPTV (SE-1,XTR-1). Sanction for Telephone at the residence of Station Engineer(HPTV) has not been accorded. The Station Engineer, DMC is looking after additional work of HPTV thereby enhancing volume of calls resulting in crossover of monthly ceiling laid by Department Of Expenditure, MOF. Therefore separate Landline connection for SE(Residence) may please be sanctioned or expenditure limit may be doubled.
27/01/2012 15:55:26
 
5
5. Ministerial/Administrative Staff :- The Kendra is newly established but the ministerial/ Administrative staff has not been sanctioned, causing difficulties in day today work. The Administrative, Accounts, store and other works are being managed through retired govt. officials and Dak, sweeping, Gardening etc. are being managed through Contract persons. DD Dte. /MIB may please be requested to provide regular staff. The Ministerial staff in r/o HPTVs may be redefined in unanimity to NLRS AIR stations etc.
27/01/2012 18:05:03
HPT BUNDI
1
Urgent requirement of 8F & 7F valves (2nos. each).Spare valves are low gain.
06/02/2012 13:06:56
 
2
Requirement of 8F valve Base.
06/02/2012 13:12:31
 
3
28v/52Amp.SMPS SUPPLY (2NOS.)are required.
06/02/2012 13:16:16
 
4
LED mast light to be installed.
06/02/2012 13:23:43
 
5
Requirement of 400/800 Amps. ACB and 400Amps. ON LOAD change over switch
15/05/2012 18:04:16
HPT DHARAMSHALA
1
ISOLATION TRNSFORMER 100KVA (SITC)
19/01/2012 13:51:42
 
2
100A, 4POLE LT CHANGE OVER SWITCH (SITC)
19/01/2012 13:52:29
 
3
Single Core 300Sq.mm. 1.1KV XLPE armoured core cable -75 mts.
19/01/2012 13:55:09
 
4
Single Core 630Sq.mm. 1.1KV XLPE armoured core cable -150 mts
19/01/2012 14:01:59
 
5
3 core 50 sq.mm. 11KV HT cable-65 mts
19/01/2012 14:05:26
 
6
Laying of LT cables from Transformers to LT room on over head cable tray
19/01/2012 14:06:32
 
7
Chemical Earthing for Diesel Generator & AMF panel
19/01/2012 16:13:35
 
8
Lightening Arrestor-03 nos. HPT IRD Receivers
19/01/2012 16:16:27
 
9
02 nos. post of EAs are to be filled on priority as these are lying vacant
25/01/2012 14:55:10
HPT FAIZABAD
1
The Transmitter is running on full power. All the available spares are in working condition. For narrow casting purpose we have two mini DV machine JVC Make BR- DV 6000E. The audio and video head of both the machine is required to be replaced. Presently we have barrowed one machine of LPT Rae Bareli. So please provide the above head for machines.
25/01/2012 13:05:42
HPT FAZILKA
1
There are 11 LED mast lights of InstaPower (5 medium intensity & 6 low intensity) on 300m steel structure Tower and at present only two are working, rest are out of order. These are required to be repaired at earliest as Fazilka city is situated on border of Pakistan and HPT is situated in the army area.
20/01/2012 15:57:44
 
2
Two PDAs which are in circuit have not been provided with earthings since installation, so earthings for both PDAs are required.
20/01/2012 15:59:55
 
3
Site Master of Anritsu (Model S331A) is out of order. It had been sent to Meera Agencies, N.Delhi for repaires but could not be repaired there because of outdated/ obsolete model and its spares are not available, so new latest version of Site Master be provided for timely measurement of SWR of antenna system.
20/01/2012 16:05:50
 
4
Shunt Capacitor equipment is required for improvement of Power Factor of Power Supply System. At present, two capacitors of 10KVAR & 5KVAR have installed as temporary arrangement & PF remains around 0.98
20/01/2012 16:11:04
 
5
Construction of inter locking paver path around Xtr building is required. It is necessary because mtc. of newly installed split A/Cs can be done easily and also for the safety of Xtr building. Estimates given by CCW is Rs. 140000/- which has already been sent to ADG (E) (NZ), N.Delhi
20/01/2012 16:16:57
 
6
Water proofing trearment of ADG,Sub-station, DG room and garages is required because condition is not satisfactory and also faces problems during rainy season. Estimate given by CCW is Rs. 161597/- which has already been sent to ADG (E) (NZ), N.Delhi.
20/01/2012 16:21:12
 
7
Construction of fencing around steel tower ladder is required to stop unauthorised climbings and also for the safety of tower. Estimate given by CCW is Rs. 198300/- which has already been sent to ADG (E) (NZ), N. Delhi.
20/01/2012 16:24:20
 
8
External repair & painting of staff qtrs is required as repair & painting has not been done since the qtrs have came into existance. Estimate given by CCW is Rs. 299537/- which has already been sent to ADG (E) (NZ), N.Delhi
20/01/2012 16:27:09
 
9
Providing & fixing PVC low level cistern & CP brass bib cock in occupied staff qtrs and office toilets is required since present high level system is out of order as it is obsolete and also not repairable. Estimate given by CCW is Rs. 31625/- which has already been sent to ADG (E) (NZ), N.Delhi
20/01/2012 16:32:30
 
10
Spare Filament Power Supply of 8V/130A DC (NEC / NJD 2054) is out of order since 1.6.2010. It had sent to HPT, Jalandhar for repair & tried hard to repair there & took lot of time but could not be repaired then It has taken back and result is that it is beyond repairs now, so new Power Supply please be provided.
23/01/2012 16:34:52
HPT GUREZ
1
1.Flooring of technicalarea 40*30sqfts perfarbly of vertiffied tiles. b) almunium partion transmitter hall. C) air conditioners to be provided for cooling of transmitter . d) False celling of transmitter building . e) painting of mast/ PDAs. 2. Spares for transmitter. a) MosfetBLF 278 b) 50ohm mounting resistance . c) Hybrid amplifier. d) Input DC voltage card of power amplifier . e) CPU Module. f) Multiplex board (Type 45324188g) power distrebution PA card 5201624-20. g) RF output conector (External thread) it is also required that two number of 16000watt Power amplifier and two number 50volts/120amp power supply (Standby may be provided).
25/01/2012 11:47:06
HPT JAISALMER
1
HPT JODHPUR
1
Provision of spares IRDs- Out of 6 Professional IRDs three are unserviceable and balance three Scopus (IRD2800) are also not fully functional. Three new Professional IRDs system are urgently required.
01/02/2012 15:04:50
 
2
All 4 nos. colour monitors (9”) installed in monitoring panel are lying defective for last many years. These may be replaced with equivalent monitors or TFT panel.
01/02/2012 15:05:49
 
3
Four no. of good quality 32”colour LCD TV may be provided as present 51 cm TV set very old and not suitable for proper monitoring.
01/02/2012 15:07:20
 
4
Three number of PA(1KW for NEC 10 KW Transmitter) are defective, MOSFET 2SK1543 and Circulator are not available in spare since MOSFET 2SK1543(30Nos) & Circulator(40 N0s) were sent to HPTV Ajmer as per the direction of ADG(Eng)NZ New Delhi vide This office letter No.Jodh/HPT/DD/Outstation/store/346 dated 5.9.11., so spares are required
01/02/2012 15:08:56
 
5
Four number of 2 Tones Cassette Air conditioner are required for Transmitter Hall as present cooling is insufficient.
01/02/2012 15:10:02
 
6
Two number of Laptop may be provided to keep the softwares & data/upgrading/configuring of NEC 10KW DD#1 & DD New Transmitters
01/02/2012 15:10:39
 
7
Fire alarm/ smoke detector system has not been provided /installed in the Transmitter building. It may be provided for safety of installation & equipments.
01/02/2012 15:11:29
 
8
Provision of Vehicle stand at Doordarshan Colony – No vehicle shade or cabins have been provided for staff quarters.
01/02/2012 15:12:07
 
9
The false ceiling work needs replacement . iIllumination in the Transmitter hall is also not sufficient, New3X36 watt CFL(2’X2’) fittings are to be provided for proper illumination and saving in electricity.
01/02/2012 15:17:54
HPT KANPUR
1
1. One spare P.A. for NEC UHF CH#23 is required. 2. Two numbers three way bypass soleneoid 230Volt,part No.34724 of Dielectric make dehydrator are required. 3. One photocopier machine is required. 4. Component required. a. Mosfet 2sk 1543 HV-20nos. are required. b. Circulators,200w(170-230Mhz) HQ2-013406-001 -6nos are required. c. Circulator HQ-013524-501 (Freq.470-580MHz)-3nos. are required. 5. Serious disciplinary action to be taken against Sh. D.K. Agarwal,Sr. Tech., (who has been transferred & relieved for LPT,Ganjdundwara ) was creating disturbances at the station and against whom many complaints has been sent since last one & half year.
09/02/2012 15:03:06
HPT KARNAL
1
Shortage of staff at subordinate level:- There is only one SEA and Two EA available at the station. At least one more SEA & one EA may be posted for smooth running of Two transmitters (HPT & LPT).
26/01/2012 15:48:05
 
2
Frequent failure of 2000 watt NEC PA particularly at slot No. 5 of 8 way combiner. The fault could not be analysed due to non availability of required spares like reducer for measurement of VSWR. Case has already been briefed to CE(NZ). Necessary spares may please be provided alongwith expert team to set the fault right.
26/01/2012 15:49:03
 
3
Four nos of 2000 watt NEC PA are out of operation due to non availability of spares. The PA repaired in the month of May, 2010 by the team from CE(NZ) (by replacing RF Transistors BLF 861A and adjustment of Transistors thresholds) again failed within one month. The Two more PAs repaired after replacing defective RF transistors are also to be tested in circuit but before putting these PAs in ckt an expert team either from Zonal maintenance wing or the service engineer from NEC may kindly be deputed to analyse the reasons of their frequent failure to avoid failure of PAs again.
26/01/2012 15:58:16
 
4
One of the Power Supply PCB of 2000 watt NEC PA has burnt in past and needs replacement as the PCB is beyond repairs. Two more spare power supply cards are required for replacement in defective PAs.
26/01/2012 16:01:49
 
5
Reject Load 4KW with accessories(NAX-39 D Feeder Part No. 5-1-8-2-5, Dummy Load with support Part No. 5-1-8-2-4 & Dummy Load Piping 2 Part No. 5-1-8-2-19) of NEC 20 KW Transmitter - Supplied Load with NEC 20 KW Transmitter accessories got burnt in 2009 and the requirement has already been submitted. Reject Load is yet to be received. It may please be expedited. The same is to be procured by the Directorate.
26/01/2012 16:02:31
 
6
Split ACs - Existing 10 Nos of ACs (2 ton Capacity) in XTR Hall were installed at the time of installation of the transmitter and are more than five years old. There is frequent failure (compressor, gas refilling etc.) and there is no spare split AC to be put against faulty AC. It is requested that some split ACs may be provided at the Station.
26/01/2012 16:03:35
 
7
Mast light: - The mast lights two Nos (24 volt DC Lamp ) at top floor of 140 mtr tower (Antena) are not working and needs replacement. LED based lights( AOL with Flasher) on 70 meters platform and two LED based lights (AOL without Flasher) at 100 meters platform are also not working. These also require replacement. It is requested that these lights/ lamps alongwith Mast Technician may be sent to HPT.
26/01/2012 16:17:27
 
8
LT Panel: Change over switch (Mains to DG) has failed due to mechanical wear and tear and is beyond repairs at Karnal. A New change over switch is required to be replaced in LT Panel. It is requested that station may be provided AMF Panel so as to minimize the failure of switches due to mechanical wear & tear.
26/01/2012 16:19:31
 
9
Transmitter control unit HPB 4739 sr no G1142 Yr 2006 NEC make of (NEC PCU 1320 SSPQ/1) transmitter has become faulty and requires an expert team to analyze its fault . Expert team from zonal office or the service engineer from NEC may kindly be deputed to set the fault right.
09/02/2012 15:33:04
HPT KASAULI
1
There is acute shotage of staff at HPT Kasauli. 01 post of SEA; 03 posts of EAs; 01 post of Technician; 02 posts of helpers; 01 post of stenographer;02 posts of UDCs;01 post of peon cum chokidar; 01 post of M/driver;thus making total shortage of 12(twelve)persons. This is as per the sanctioned strength for one 10KW HPT Transmitter only. Available staff:- [Only sea-1,sr.tech-2,tech-2(both are promoted from helper are presently available to run HPT DD-National(10KW),HPT DD-News(20KW) and Transposer-Pallu;125Kms away,Transposer-Solan-30Kms away,VLPT-Parwanoo-50Kms away.)].
27/01/2012 13:59:53
 
2
Request for approval/sanction of estimate ( CCW)amounting Rs. 6,53,200/- has already been sent to zonal office regarding renovation of Kitchen,Bath & Toilets of Doordarshan staff Quarters at HPT Kasauli.
27/01/2012 14:04:24
 
3
Request for approval/sanction for 1. Internal & external finishing of TV Transmitter bldg. at Kasauli ---- Estimate amounting Rs. 1,23,380/-(From CCW) 2. Providing steel plateform & placing water storage tank at Doordarshan staff quarters - estimate amounting Rs. 1,69,837/- 3. Internal & external finishing of Doordarshan Staff quarters at Kasauli(H.P). --- Estimate Amount Rs. 183933/- 4. P/F wire mesh doors in all staff quarters at the main entrance -- Estimate amounting Rs. 1,17,467/- 5. Replacement of damaged asbestos sheet with MS sheet on the ceiling around the office building & repair of the front porch of the office building at HPT Kasauli. (Estimate amounting Rs. -- Rs. 1,87,596/-) 6. Repair of the foundation of the base of Mast & Buiding at Transposer Solan(Estimate amounting -- Rs. 88,400/- Detailed estimate of the above proposed work from CCW Chandigarh has already been sent to Zonal office,New Delhi
27/01/2012 14:24:43
 
4
Request for approval/sanction to engage the persons against posts lying vacant at the station.So that the work of Two HPTs ,Two Tranposers and One VLPT can be done smoothly and safely.
27/01/2012 14:27:13
 
5
Transposer-Pallu:- i)Security fencing,pathway-repair required(estimate is to be procured).ii) Building and Mast painting long due. iii) Battery charger 24V,40 Amp. defective,replacement required. iv)PA power supply unit defective,Notch Filter defective. v)Solar panel (4 Nos)glass protection broken.vi)Battery Bank alongwith solar panel charge controller is defective,served its useful life, required to be replaced. Transposer-Solan:- i)Mast Base has left the ground contact partially,surrounding land around the mast base has sunk and mast is standing with Guy Wires support.Needs immediate action.ii)Spare Exciter defective,iii)PA power supply unit defective.iv)Building and Mast painting long due.v)Battery charger 24V,40 Amp. defective,replacement required.vi)Battery Bank alongwith solar panel charge controller is defective,served its useful life, required to be replaced. VLPT-Parwanoo:- i)Porta cabin renovation required.ii)Security fencing repair required.iii)Dish for regional reception is uprooted due to strong wind pressure,needs to be relocated and installed.iv) Battery Bank alongwith solar panel charge controller is defective,served its useful life, required to be replaced.v)DC-DC converter supply for exciter is defective.vi)PA power supply unit defective. Note:- All tranposers and VLPT need atleast one attadant/caretaker at each of these unmanned DD installations.At some places like transposer pallu and transposer solan the attempts to intrude and take away the things are noticed.
27/01/2012 14:29:20
 
6
Split ACs Six nos.(2 ton each) are required as the existing ACs installed at HPT Kasauli have completed their useful life. There is frequent problems in the existing ACs & compressors of three ACs are defective.
27/01/2012 14:34:18
 
7
DD-News(20KW,MakeR&S) i)Visual PAs------4nos defective(3Nos intermittent problem and 01 no(spare) defective). ii)Aural PA(spare) -----01 no defective. iii)Pump control unit: coolant frequent refilling problem; 3-phase relay make Siemens faulty, bypassed, due to which heat exchanger fan keep on running contonuously. iv)TCU(spare) ---faulty.v)Modulator and ATV Encoder (one no each) is with zonal office,may be returned. v)ADA--2Nos, Programme amplifier--01 No. defective. DD-National(10kw,NEC) i)Visual PAs-4Nos including 02No spare PAs -defective. ii)Split ACs-03 Nos defective. iii)VDA-EQ(make grass valley)-PS module 02nos defective. iv)colour Monitor (make Sony)-02No defective. v) 50KVA AVR intermittent problem. Immediate requirement of components 1. SWITCH MAGNET SC-1N 2A2B(PART NO. HS4-002311-212) ------ USED FOR THE BLOWER OF NEC TRANSMITTER. 2. SURRGE ABSORBER ERZ-C14DK391(PART NO. HV9-000413-001) -- USED AS SURGE ABSORBER FOR BLOWER OF NEC TRANSMITTER. IT GOT BURNT & BYPASSED FOR THE TIME BEING. 3. ABSORBER FOR COUPLER SOUND --- 50 OHM, 400 WATT (USED FOR r & s TRANSMITTER). IT GOT BURNT & DUMMY LOAD IS USED IN PLCE OF ABSORBER. 4. 3-phase relay make Siemens.
30/01/2012 11:37:47
 
8
1. THE LIGHTNINING arrestor INSTALLED AT HPT KASULI IS NOT WORKING PROPERLY DUE TO HIGH EARTH RESISTANCE OF THE RESPECTIVE PIT. CHEMICAL EARTHING PIT IS REQIRED.
30/01/2012 12:09:35
HPT KATHUA
1
1. High Power Transmitter, BEL/ 5KW The present working condition of HPT is not satisfactory. Only 02 PAs for Vision and 01 PA for Aural are functioning giving approx. 800W. 01 no PA along with Power Supply kept spare for emergency purpose.. Some of the PAs are unable to put into circuit due to non-availability of working Power supply units. Total 05 nos Defective power supply are kept. Only one exciter unit is functional. Both the blower motors in CIN diplexer is defective. The working condition of HPT has been brought in the agenda points of last Zonal conference also. The following cards are required for Digitronics make 32V, 80A Power supply model: A 2875-31. 1. 8052 M1 - 15 Nos 2. 9268 - 15 Nos 3. 9276 - 05 nos 4. 6087 - 05 nos 5. 6886 - 05 nos The following Cards are required for 5KW UHF Tx. (Ch # 31): 1. 800W Power Amplifier Part No: 114002005770, Make: BEL - 06 Nos required
23/03/2012 11:56:39
 
2
2. Diesel Generator / 62.5 KVA/ Greaves make/ Model No (Mark No): 6YDA MK3 The 62.5 KVA Diesel Generator, Greaves make Model No (Mark No): 6YDA MK3 was installed in March,2000. It has run 3980 Hrs. This Generator sometimes generate hunting sound, it needs immediate Overhauling. A silent generator may please be procured and supplied for HPT, Kathua.
23/03/2012 11:57:49
 
3
3. Secourity Lights at HPT Campus :- 15 nos 70w Crompton Greaves Lights may kindly be provided for HPT Campus for proper illumination
23/03/2012 11:58:23
 
4
4. Motor Vehicle:- The SBG under Motor Vehicles is Rs. 50000/-. The expenditure upto Dec’11 is Rs.41,900. Rs 20000/- Petrol bills are pending The balance is not sufficient for remaining 3 months. This vehile is also used for VLPTs The average distance of VLPTs from DMC is 85 Kms. If 2 trips per VLPT per month are made, the Petrol required is 204 liters per month. For one year the Amount is Rs. 1.0 lakhs. Due to bad road condition the maintenance vehicle cost Rs.30,000( as per last 2 years expenditure). Therefore, a bare minimum of Rs. 1.3 lakhs per year is required. Any thing less than this would amount to cut in the trips and may affect the proper maintenance of VLPTs. A detailed requirement has been sent to Budget section of DG:DD. This requires recommendation of Zonal office to get the funds.
23/03/2012 11:59:39
 
5
5. Photo Copier :- The Photo copier (Canon make, model: 7612) was received from CP&S in 11-7-2002. Now, the machine is not delivering the required quality output. The machine has been serviced several times in the past and further repairing is not cost-effective. The model is obsolete and its spares are not available. Therefore, a Photo copier machine is urgently required.
23/03/2012 12:00:30
 
6
6.Minor Work :- HPT Kathua has 05 Nos of C-type and 03 Nos of B-type staff quarters. There are some civil works required for HPT Office building and staff quarters as detailed below: 01. HPT Office building (White washing required):- The distemper has worn out and black patches are seen at number of places. The general look is shabby. 02. HPT Office building (New Collapsible gate):- at the entrance The main entrance to office building has only aluminium glass door. This is not sufficient for security point of view. 03. HPT Office building (Drain arrangement in Toilets):- The Gents toilet room in the ground floor does not have drain arrangement. Due to this, the water stagnates on the floor. 04. HPT Office building (Replacement of Urinal ):- The urinal on the first floor is broken. 05. HPT Office building (Repair of Flush tank in Gents toilet in First floor):- The water does not get stored in the flush tank. It leaks continuously. 06. HPT Office building (Damage of plaster on the walls) The plaster has come out at many places. This needs to be re-done and painted. 07 Staff quarter No. C-4,C-5 & B-2:- A. Shed on the Balcony B. Replacement of Doors :- The balcony is open to sky. The rain water & sun heat is directly falling on the door and has damaged the Doors. Mere replacement of door will not serve the purpose. The balcony has to be covered with acrylic roof shed to prevent water from falling on the doors. 08. Staff quarter No. C-5 & C-3:- Seepage of water in Bed room and Kitchen.Due to seepage of water, the walls have become damp. This needs to be stopped. 09. Staff quarter No. C-4,B-1 & B-2:- Leakage of water from pipes in the Bathroom and toilets Due to leakage of water, the walls have become damp. This needs to be stopped. 10. Staff quarter No. C-1, C-2, C-3, C-4:- The flooring, wherever mosaic flooring is not done, is completely damaged.Flooring to be made new with mosaic flooring for uniformity and long life. 11.Septic Tank of Staff quarters:- Septic Tank is overflowing Needs to be emptied. Minor works SBG Rs20000/- , up to Dec 2011 Rs 19400/- spend, funds are insufficient, for which the matter has been taken up with Budget section of DG:DD. Zonal office may recommend the requirements.
23/03/2012 12:04:15
HPT KUPWARA
1
PRASAR BHARATI (BROADCASTING CORPORATION OF INDIA) DOORDARSHAN, HPT, KUPWARA No. HPT/KUP/Zonal con./2011-12/ Dated:24.01.2012 The Additional Director General (E), (N/Z), (Kind Attn., Smt Sadhna Kumar,DDG (E)-DDM), AIR & Doordarshan, Jam Nagar House, Shahjahan Road, New Delhi.-110011 Sub.: Agenda points for Zonal Conference 2012 in respect of Doordarshan HPT, Kupwara Sir, The following points are being submitted for consideration in the Zonal Conference 2012 in respect of HPT Kupwara. 1. There are two nos. of transmitters (Make – Thomcast, Power - 10KW each ) operating on DD-1 (Ch # 5) & DD Kashir (Ch. # 12).Presently, both DD transmitters are not operating on full power because of six numbers of defective Power Amplifiers. For repairing of the same, list of spares required was dispatched to the O/O CE(NZ) .Moreover some boards of Exciter & one no of Power Supply of PA is faulty. due to non-availability of components 2. Requirement of spare components & equipment has already been sent to Zonal office. 3. Shortage of staff – a) Out of four sanctioned posts of AEs ,only Two post is filled.& one AE under order of transferred b) Out of two sanctioned posts of Sr.Tech, only one post of Sr Tech,is Filled since long c) Out of two sanctioned posts (CG-I & CG-II one each) only one post of CG- II is filled, 4. As there is drinking water problem so Borewell is required at HPT Kupwara for drinking water. CCW(civil) Srinagar & local PHE office has been approached several times but no response received from there side. . 5 Complete boundary wall of HPT required urgent repair/painting , Internal/External painting of Hostel building, Providing and Laying the Cement concrete on the road from main gate to XTR side.CCW(C ) has already taken measurement. Estimate from there side has been sent to Zonal office for administrative approval & expenditure sanction from appropriate Head of CE(N/Z). 6 Two Nos 60 KVA UPSs were supplied by M/S Aplab Ltd ,New Delhi and Commissioned on 14.09.2009 . After few month UPSs failed to work complaint attended by M/S Aplab Engineer from Delhi/Jammu few times but could not succeeded with the result both UPS are now not in working Condition Yours faithfully, (Sk.Abdul Kalam) Dy. Director (Engg.)
24/01/2012 17:48:36
HPT LAKHIMPUR
1
IRD SPIKE PROTECTOR is required
28/03/2012 11:09:19
 
2
NEW DG set
28/03/2012 11:11:23
 
3
Mast light repaire
28/03/2012 11:12:29
 
4
In one no of PA bais current become zero
28/03/2012 11:13:58
HPT MUSSOORIE
1
Canopy for existing 62.5 KVA Generators - 03 Nos. Being residential area to reduce sound pollution as there are many complaints from neighbours.
13/02/2012 19:33:37
 
2
Replacement /complete overhauling of existing 62.5 KVA Generator,Make-Ruston. This is standby Generator for both the services. Commissioned on 06th Dec. 1989.Total hrs. of working - 6090.At present not in working condition.
13/02/2012 19:46:26
 
3
Valve base of 7F (1 kw)BEL MK-III - 02 Nos. As no spare is available.
13/02/2012 19:52:46
 
4
8F Valve (10kw)BEL MK-III - 02 Nos. As spare .
13/02/2012 19:57:14
 
5
Dual Channel CRO 400 MHz.- 01 No.
13/02/2012 20:02:00
 
6
Wave form monitor . Tektronics 1731 - 02 Nos. For DD-I Control Console Pannel .Existing are very old version,defective & unserviceable.
13/02/2012 20:09:07
 
7
RF Meter .- 01 No.
13/02/2012 20:10:23
 
8
Earth resistance Meter Digital Auto .- 01 No.
13/02/2012 20:13:03
 
9
Computer for Engg. Store - 01 No.
13/02/2012 20:19:00
 
10
LCD TV -(32 INCH ) - 02 Nos. For monitoring purposes .
13/02/2012 20:22:42
 
11
Battery Bank for Transposer. 500AH,2V,- 12 X 2 = 24 Nos. Existing battery bank is very old and in ckt. since 1990 and 10 nos. batteries of 2V,800AH BUI Make were provided in 2003 and in ckt.since April 2003.
13/02/2012 20:32:23
 
12
Installation of LED Aviation Obstruction lights .
13/02/2012 20:47:07
HPT NOWSHERA
1
2nos.On load Changeover switch 800 Amp 4pole required. Specification and Make as under IE800A, UE 415V Make Sucame HPL Pvt Ld Gurgaon Haryana.
06/02/2012 13:53:37
 
2
4nos variable main transformer (DimmerSet) and 60nos. of carban brush urgently required. The voltage variation at this station very high. Total 12 nos variable transformers are incircuit in 2nos of 125KVA AVR at this station. The Specification of Dimmer is as follows: Type 24035 input 270Volt Out put 0-270V. 35 Amp Normal, 38 Amp Max Make A.E. Ltd working in 125KVA AVR A.E. Ltd
06/02/2012 14:45:55
 
3
2nos Computer with windows.7 along with 19 inch LED monitor are required. as old computer are not supporting some new software.
06/02/2012 14:50:29
 
4
4nos 21 inch LED TV monitor are urgently required. 2nos Old 21 inch Sony TV Monitor are defective. its picture tubes are faded out due long use.
06/02/2012 14:53:27
 
5
One 6.3M, C- Band PDA is required. The station having 2nos of C-Band PDA. Regional Service is being relayed only through DTH receivers .
06/02/2012 14:55:59
 
6
One AVR 30-40KVA rating is required at Doordarshan Staff Hostel as the in put supply voltage is very much fluctuating as well as very low (140V) and most of elect. appliances/computers power supply fails during fluctuations.
06/02/2012 14:59:32
 
7
Construction of one Security Post and Guard room facility at Doordarshan Staff Hostel is needed. Sanction for deployment of 8 nos of security Guards ( retired Ex service man) is required instead of armed guard as already sanctioned by DG:DD, 4nos for Doordarshan Hostel Nowshera & 4nos for HPT. Request letter has been sent to DG:DD.
06/02/2012 15:04:15
 
8
One Spectrum Analyzer Make Agilent E4402B, ESA-E Series is defective since long time need to be repaired from authorized dealer.
06/02/2012 15:08:55
 
9
Servicing of 4nos Air Circuit breaker Make CG, Pulser is urgently required. Specification of ACB IS AS follows: LH 800 DMI, S4P. 800Amp, US415V, UT 1000V shunt trip 240V A.C
06/02/2012 15:12:21
 
10
Insufficent Budget in Sub Head Salary non IRLA, OE, DTE, METP.
06/02/2012 15:13:58
 
11
White washing and paints of HPT and Hostel building is urgently required as ugly look of Xtr Hall after AVR catch fire.
10/02/2012 17:16:33
 
12
One dehydrator is required urgently. Existing Spinner make dehydrator is defective and beyond repair
01/05/2012 22:21:40
HPT PITAMPURA (DELHI)
1
Replacement of Lifts(02 Nos)(Proposal is submitted to DG:DD) No spares of (10+1)C-band Uplinking Requirement of critical of spares of NEC- XTR Replacement of 3 x 20 Ton A.C. Plants Construction of Boundary Wall (Proposal submitted to ADG(E)(DDM-NZ) Renovation of Earth-Station building
30/03/2012 13:11:00
HPT POONCH
1
Restoration of Full power(10KW) of DD National transmitter. 10 Nos of PAs repaired at the Massorie Workshop are required to be put in circuit. Expert team from ADG(E)(NZ) office is awaited.
24/01/2012 13:28:40
 
2
Reapair of two numbers of HT Transformers , 250 KVA capacity each.Repeated request to power development deptt. has yielded no result.
24/01/2012 13:31:56
 
3
Reapair of 11 KVA Voltage Circuit Breaker Indoor panel which is lying defective since 27-08-2011. Repeated request to the origional manufacturer M/s Yamuna Infrastucture Ltd Kolkatta, has yieled no result.
24/01/2012 13:36:28
 
4
Refurbushing of Earthing pits for HT transformers, LT panel, 150 KVA AVRs etc at the Transmitter.
24/01/2012 13:38:12
 
5
Replacement of 62.5 KVA Generator(Ruston Make) which has already served the usefull life (25 Yrs) and thus causes frequently breakdown. Also being old model spares are not available in the market.
24/01/2012 13:42:59
 
6
The following equipment are required for input and monitoring of DD National transmitter. i) 10 x1 Video Monitoring switcher ii) 10 channel program switcher( Audio- Video) with remote iii) VDA - 3 Nos iv) Colour stab amplifier- 1No. v) Dehydrator- 1No.
24/01/2012 13:47:14
 
7
Reapair of retaining wall and boundry wall to protect the security fencing at HPT which is badly damaged and is a source of constant security threat to the transmitter complex. Estimate for the same from CCW is lying with ADG(NZ).
24/01/2012 13:51:04
 
8
Construction of Santry cum reception room at city office Rajouri which houses the offices of HPT poonch, DMC Rajouri/Poonch, PGF Studio, Staff quaters of Doordarshan and AIR FM hostel but no security has been provided for want of the above mentioned facility. Estimate for the same from CCW is lying with ADG(NZ).
24/01/2012 13:56:16
 
9
Providing and fixing of wire mesh door and windows for 15 Nos of Staff quarters at city office Rajouri. Estimate for the same from CCW is lying with ADG(NZ).
24/01/2012 13:59:21
 
10
Repair of 4 nos of quarters at Transmitter which are in very bad shape for which estimate from CCW is lying with ADG(NZ).
24/01/2012 14:01:48
 
11
Repairing of approach road ( appox 300 meters) at HPT (BG) which is in very bad shape.
24/01/2012 14:04:28
 
12
Replacement of GI sheet over the roof of old transmitter building which was damaged due to cross border shelling . It is used by the Army personal deployed for the security at transmitter site. Estimate submitted by CCW is lying with ADG(NZ).
24/01/2012 14:09:36
 
13
Posting of subordinate Engineering staff to HPT Poonch as there is acute shortage of staff and one post of SEA, 3 posts of EA and two posts of Tech are lying vacant, thus making it difficult to maintain a proper shift.
24/01/2012 14:14:55
 
14
Renovation of Kitchen, WC bath of Staff quarters type C ( 8 Nos.) and Type B(6 Nos.) .
25/01/2012 12:19:33
HPT SAMBA
1
Attending the faults in 60 KVA UPS of both transmitters and replacement of defective batteries of battery banks which is under guaranty period by M/s Aplabs Ltd.
27/01/2012 12:21:12
 
2
Replacement of defective mast lights 1 no. medium intensity and 1 no. low intensity. One no medium and one low intensity has already been replaced.
27/01/2012 12:24:23
 
3
SITC of chemical earthing ( 4 nos. ).
27/01/2012 12:33:32
 
4
Concrete work in hostel area. Security wall in hostel block.
27/01/2012 12:35:45
 
5
Replacement of air filters of both TX.
27/01/2012 12:39:40
 
6
Providing spare control cards & Display cards for both TX.
27/01/2012 12:42:54
 
7
Renovation of hostel rooms and replacement of broken doors.
27/01/2012 12:44:48
 
8
Providing 5 nos. split AC ( 2 ton ) for TX hall.
27/01/2012 12:48:27
 
9
Providing 2 nos. professional IRD.
27/01/2012 12:50:43
 
10
Approval for uniterrupted &Independent feeder from J& K SEB.This station is facing more than 4-5 Hrs power cut daily and 12-18 hrs during stormy and rainy climate. Due to this, HSD consuption is too much higher.
27/01/2012 12:54:21
 
11
White washing of technical area and hostel block.
27/01/2012 12:59:12
 
12
27/01/2012 13:03:05
 
13
Repairing/replacement of TV test Receiver.
02/05/2012 17:35:55
 
14
Replacement of SITE Master battery.
02/05/2012 17:43:15
HPT TITHWAL
1
Major cracks has been occured during earthquake 2005 in the transmitter building which are required to get repaired through CCW Deptt of AIR Srinagar. 2. In adequqate funds hav been realesed which are required to enhance under sub head power supply,OE, RRT and Motor Vechile.
25/01/2012 11:59:29

Back